19
35. Route the Low Cable (72) under a 90mm Pulley
(58). Attach the 90mm Pulley and two Half
Guards (40) to the Center Base (2) with an M10
x 46mm Button Bolt (96) and an M10 Locknut
(79).
36. Wrap the Low Cable (72) over a 90mm Pulley
(58). Attach the 90mm Pulley, a Small Cable
Trap (63), and two Half Guards (40) to the sec-
ond hole from the bottom of the two 90mm
Pulley Plates (74) with an M10 x 53mm Button
Bolt (147) and an M10 Locknut (79).
Make sure
that the Small Cable Trap is oriented to hold
the Low Cable in the groove of the 90mm
Pulley.
79
72
58
2
40
40
96
35
34. Route the Low Cable (72) over a 90mm Pulley
(58). Attach the 90mm Pulley and two Half
Guards (40) to the Double U-bracket (46) with
an M10 x 46mm Button Bolt (96) and an M10
Locknut (79).
46
40
40
96
72
58
40
40
58
72
74
74
63
147
79
37. Route the Low Cable (72) under a 90mm Pulley
(58). Attach the 90mm Pulley and two Half
Guards (40) to the Center Base (2) with an M10
x 46mm Button Bolt (96) and an M10 Locknut
(79).
37
72
40
40
58
2
79
96
34
36
79
Summary of Contents for Platinum GGBE6958.1
Page 37: ...37 NOTES ...