17
20. Route the Low Cable (53) under a Pulley (48)
and through the Lower Upright (93).
Attach the Pulley (48) inside the Lower Upright
(93) with an M10 x 67mm Bolt (71), two M10
Washers (57), two 13mm Spacers (52), and an
M10 Locknut (56).
21. Route the Low Cable (53) over a Pulley (48).
Attach the Pulley (48) and two Half Guards (43)
to the Double U-bracket (63) with an M10 x
46mm Bolt (81) and an M10 Locknut (56).
Make
sure that the Half Guards are on the outside
of the Double U-bracket as shown.
20
56
93
53
52
52
57
57
48
71
21
53
48
43
63
81
22. Route the Low Cable (53) under a Pulley (48).
Attach the Pulley (48) and two Half Guards (43)
to the Base (1) with an M10 x 46mm Bolt (81)
and an M10 Locknut (56).
Make sure that the
Half Guards are on the outside of the
bracket as shown.
22
53
43
1
43
81
56
48
Bracket
43
56