Assembly Procedure
Step 5.
Note: The side burner and associated table are supplied with the hose connected and are packed
inside the hood. Leave the side burner inside the hood during assembly until you are ready to attach
the side burner (step 6)
Take the main body and place it on the leg assembly with 3 screws M6 x 12mm slotted hex head
black. Attach the gas bottle bracket to the left hand side of the barbeque. On the outside of the
barbeque insert 2 M6x12mm screws through the bracket and into the holes in left side panel of the
main body; the M6 nuts are fitted from the inside.
Page 12