BT-F NEW Intelligent Dispensing Peristaltic Pump
24
4
5
GND
Signal ground line
6
7
8
9
Table 2 RS232 definition
8
Operation Instructions
8.1
Before Operation
1) Please check the packing slip to make sure nothing is wrong or
damaged in the package. If there is problem, please contact the
manufacturer or distributor.
2) Read through the instruction
.
3) There should be more than 200 mm space for the back of the pump
when it is running.
8.2
Power Connection
The voltage of the power supply should be marked on the sticker of the
pump. Please make sure to use the right power source for the pump.
8.3
First Run Wizard
Flow Rate Calibration
Calibrate the flow rate of the actuators by measuring the actual
transferred liquid using the balance or measuring cup, when
•
First time to use the pump
•
Pump head is changed
•
Tubing is replaced
•
Transfer fluid in one channel with dual pump heads
•
Tubing is reinstallation
•
After continuous work for a long time
To calibrate the flow rate
1) Install pump head and tubing.
2) In the General Settings window, set the model of the installed pump
head and tubing.