ASSEMBLY INSTRUCTIONS
ELEVATED CHIN UP STATION
Door Molding Wedge
With pointed end down, slide
Door
Molding Wedge
downward, behind
door frame/moulding.
Position bottom edge of Plastic
Leverage Bar into the installed
Door
Molding Wedge
, guiding it down to
securely rest on top of door frame/
molding.
Properly installed, the
Door Molding
Wedge
helps keep the Leverage Bar
resting on the door frame/molding.
Before each exercise, always check
that the Leverage bar is resting on the
door frame/molding.
For questions or missing parts, please contact GoFit at 888-530-4441
©2017 GOFIT, L.L.C. TULSA, OK
4
1
2
3