background image

ASSEMBLY INSTRUCTIONS

ELEVATED CHIN UP STATION

Place Self-Seating Bolts through holes  

on 

Leverage Bar

 as shown —one Bolt 

for each Side Bar. Side Bars will rest in 

indentions on 

Leverage Bar

.

Put Bolt through hole on 

Side Bar

 

(adjust 

height by choosing one of 3 holes). 

 

Place Lock Washer on Bolt; thread on  

Lock Nut. Repeat for each Side Bar. 

Finger-tighten to secure Lock Nuts.  

(Note: do not fully tighen with wrench  

until Step 10). 

Photo shows Leverage  

Bar attached at center holes.

Step 1  

Step 2  

Step 3

Fully assembled— shown in chin up position

Fully assembled—shown in push up position

2

Shown in Push Up position

Step 6   

Position 

Curved Bar

 as shown in fully 

assembled photo above 

(be sure curve  

is facing correctly)

. Line up holes in 

Curved Bar

 with holes in 

Side Bars

;  

slide 

Eye Bolts

 through holes as shown.

Step 5   

Slide two halves of 

Curved Bar

 together 

(small end into larger end).

 Line up holes 

and put Short Hex Bolt through hole on 

Curved Bar. Place Lock Washer on Bolt; 

thread on Lock Nut. Finger-tighten.

Step 4   

Slide two halves of 

Straight Bar

 together 

(small end into larger end). 

Line up holes 

and put Short Hex Bolt through hole on 

Straight Bar

. Place Lock Washer on Bolt; 

thread on Lock Nut. Finger-tighten.  

DO NOT tighten Bolts fully until you reach Step 10 to allow for assembly and leveling.

For questions or missing parts, please contact GoFit at 888-530-4441      

 

 

 

     

©2017 GOFIT, L.L.C.  TULSA, OK

Summary of Contents for GF-ECS

Page 1: ...ves 1 Straight Bar 2 halves 1 Leverage Bar 2 Eyebolts 2 Self seating Bolts 2 Long Hex Bolts 2 Short Hex Bolts 8 Lock Washers 8 Lock Nuts 1 Door Molding Wedge 32 Total Pieces Parts visual references Tools required Adjustable Wrench For questions or missing parts please contact GoFit at 888 530 4441 2017 GOFIT L L C TULSA OK HOLES ALLOW FOR THREE HEIGHT OPTIONS ...

Page 2: ...Push Up position Step 6 Position Curved Bar as shown in fully assembled photo above be sure curve is facing correctly Line up holes in Curved Bar with holes in Side Bars slide Eye Bolts through holes as shown Step 5 Slide two halves of Curved Bar together small end into larger end Line up holes and put Short Hex Bolt through hole on Curved Bar Place Lock Washer on Bolt thread on Lock Nut Finger ti...

Page 3: ...ying square and level Easy In Out Installation First install Door Molding Wedge as shown on page 4 Standing on non hinge side of doorway pass Leverage Bar through the doorway while moving it upward above door frame molding on other side of doorway Position bottom edge of Leverage Bar into the installed Door Molding Wedge see page 4 then guide Chin Up Station downward until the Leverage Bar securel...

Page 4: ...nto the installed Door Molding Wedge guiding it down to securely rest on top of door frame molding Properly installed the Door Molding Wedge helps keep the Leverage Bar resting on the door frame molding Before each exercise always check that the Leverage bar is resting on the door frame molding For questions or missing parts please contact GoFit at 888 530 4441 2017 GOFIT L L C TULSA OK 4 1 2 3 ...

Reviews: