INSTALLATION
1. Before installation check the pump for any transit damage.
2. Mounting Platform
If a mounting platform is fitted, note the bolt points (see drawing in fig.15 or 16) to
secure the pump to the vehicle chassis
–
Figure 3.
2. Priming System
Piston Primer Type
–
Connect two flexible pipes (25mm, 1inch internal dia.) to the discharge ports on each
primer.
Discharge can be piped to the ground.
Discharge can be piped back to main tank
– if no foam system is used.
Discharge can be piped to a separate holding tank.
Figure 4.
Piston primer discharge
–
connect
25mm
(1in)
flexible pipe. Length to be
sufficient
to
discharge
safely away from operator
Fastening bolt points
–
M16, high tensile cap
screws, four off