![Gocycle G2 Gear Servo Service Document Download Page 12](http://html1.mh-extra.com/html/gocycle/g2-gear-servo/g2-gear-servo_service-document_2237603012.webp)
Gocycle Service Document: G2 Servo 1.0
October 2014 © Karbon Kinetics Limited. All Rights Reserved.
10
4.
S
ERVO
R
EMOVAL
Note: Before commencing ensure the Gocycle battery is in ‘
Sleep Mode’
or disconnected and
removed
4.1.
Once the Chainring
has been removed, the
Main Junction Board (JB)
will be v as shown.
4.2.
Remove the
Junction Board by undoing
the retaining bolts.
Depending on Gocycle
Frame Number there may
be 3 or 4 securing bolts.
Use either a 2.5mm Allen
key or a T10 to undo the
securing bolts.
Note: Please note the
location of the securing
bolts on your model of
Gocycle for
reinstallation later on.