INSTALLATION TIMELINE

1.

Prior to anchor system and goal assembly,  call utility services for location of underground utility lines before you dig.

2.

Vertical main post assembly is a two part process.

ANCHOR SYSTEM INSTALLATION INSTRUCTIONS (Day 1)

Before digging hole for anchor system, check for
buried power, gas, water, and telecommunication
lines! Failure to do so could result in serious or fatal
injury! Contact your local utility company if unsure.

PART 1

Day 1.

Complete Anchor System Installation Instructions.
(Below)

Day 2-4.

Allow concrete to cure.

PART 2

Day 5.

Complete Goalrilla

TM

assembly instructions. (Requires

four adults)

Figure 1

Figure 2

Note: Using a concrete form for the top 4" of the concrete
is recommended. Cardboard forms can be purchased at
some hardware and home stores or a wooden form can
be constructed out of 2 x 4's.

3.

Mix and pour concrete into hole. Follow instructions on
concrete bag. Stop about 18" below court level.

4.

Insert four reinforcement bars (#40) into concrete 8" apart
creating a square in center on hole.

5.

Place form in desired location and finish pouring concrete
up to court level.

6.

Push anchor system into concrete and agitate to work out
voids in concrete. Immediately use a level to level and square
anchor plate to playing surface. Clean off any concrete that
may be on exposed threads

.

Let concrete stand for a MINIMUM of 72 hours.

2.

Assemble anchor system as follows: Thread nut (#35) to bottom
of threads on anchor bolt (#39) insert threads of anchor bolt
(#39) through hole on anchor plate (#38) and secure with nut
(#35). Repeat this step for the remaining
anchor bolts. See
Figure 2. Note:
Each

leg

of

anchor

bolts

should face the
anchor bolt to the
right. See Detail
A.

1.

Determine the location of the anchor
system. The proper location is as

close to

the court without making contact

,

as shown in Figure 1. This,
however,is a general rule.
If you need to locate the
anchor system in a location other than
this, use the following dimensions as a
guide.

Items needed for Anchor Installation (not included)

11 - 80 lb. bags of concrete
1 - post hole digger (optional)
1 - 15/16” open end wrench
1 - 15/16” socket and ratchet (optional)

1 - wheel barrow
1 - garden hose
1 - level
1 - tape measure

Note: For best results with less vibration, anchor system
should be independent of court. If pouring concrete for
both at same time, add an expansion joint in between.

Overhang when adjusted to 10 ft. = 48”

1 - concrete form (see note after step 2)

Note: The bottom four nuts will be forever embedded in
concrete.  The top four nuts remain on bolts and are 
used for leveling.  (See Step 14 on page 10)

THESE NUTS 

USED FOR 

LEVELING

OVERHANG

18 INCH

MINIMUM

REAR

CLEARANCE

REQUIRED

Note: When digging hole, if you hit rock 
and cannot dig through contact a contractor.

Note: Failure to dig and fill hole as instructed will result 
in increased system vibration.

Summary of Contents for DC72E1

Page 1: ...omer service department at Phone 1 888 USA GOAL Toll Free Fax 1 866 873 3536 Toll Free E mail basketball escaladesports com Mailing Address Escalade Sports PO Box 889 Evansville IN 47706 Please visit our World Wide Web site at www Goalrilla com ON LINE TROUBLE SHOOTING TECHNICAL ASSISTANCE ON LINE PARTS REQUESTS FREQUENTL Y ASKED QUESTIONS ADDITIONAL ESCALADE SPORTS PRODUCT INFORMATION 2L 7252 00 ...

Page 2: ...2 ...

Page 3: ...Washer 8 Pieces 37 5 8 Thread Protector 4 Pieces 34 Hardware located in Anchor kit box 3 1 OD x 6 3 16 Pivot Tube 1 Piece 14 14 5 1 2 4 Pieces X 1 1 4 Dia Plastic Washer 52 1 2 13 x 4 3 4 Hex Bolt 2 Pieces 54 5 8 11 Nylon Lock Nut Thin 1 Piece 5 8 Split Washer 4 Pieces 1 2 13 Nylon Locknut Thin 2 Pieces 47 8 5 8 11 x 11 1 2 Hex Bolt 1 Piece 33 1 2 13 Nylon Lock Nut 6 Pieces 4 ...

Page 4: ...es 3 8 X 19mm Flat Washer 4 pieces 3 8 X 19mm Flat Washer 22 1 2 13 x 11 1 2 2 Pieces 7 5 8 Plastic Washer 4 Pieces 53 4 5 8 Flat Washer 2 Pieces 37 10 1 2 13 x 4 1 4 Hex Bolt 2 Pieces 51 10 X 1 1 8 Hex Head Self Tapping Screw 8 pieces Phillips 3 8 16 X 2 1 2 X 1 1 4 Dia 4 Pieces 56 1 2 18 Pieces X 1 1 4 Dia Plastic Washer 5 Hardware required for rim assembly Peel Stick Plastic Washer ...

Page 5: ...d threads Let concrete stand for a MINIMUM of 72 hours 2 Assemble anchor system as follows Thread nut 35 to bottom of threads on anchor bolt 39 insert threads of anchor bolt 39 through hole on anchor plate 38 and secure with nut 35 Repeat this step for the remaining anchor bolts See Figure 2 Note Each leg of anchor bolts should face the anchor bolt to the right See Detail A 1 Determine the locatio...

Page 6: ...ghten bolts tight 1 Slide Actuator Sleeve 15 over Actuator 16 and place near the top of Steel Actuator and Plastic Actuator Sleeve until equal amounts stick out on both sides of Actuator See Figure 3 Actuator Cap 13 on top Slide Pivot Tube 14 in hole NOTE It may be necessary to use a rubber mallet to tap in Pivot Tube Figure 3 If insert it into the top of the Pole 2 It may be necessary to use a ru...

Page 7: ...37 four Plastic Washers 53 and one Lock Nut 54 See Figure 5 Tighten bolts 7 and 8 snug but do not over tighten Board Arms must pivot freely Attach Middle Arm 24 to Pole 2 as shown in Figure 6 using Bolt 7 two Flat Washers 3 four Plastic Washers 5 and Lock Nut 4 7 8 37 53 54 37 53 53 53 14 11 them into open ends of Middle Arms 24 It may be necessary 7 3 5 9 5 4 3 5 9 2 24 N O TE Longer distance goe...

Page 8: ...pper Arm 6 It may be necessary to use a rubber mallet to tap plugs in 11 DRAIN HOLE DRAIN HOLE 8 6 10 3 5 3 4 11 12 52 3 5 5 3 4 12 5 IMPORTANT Upper Arm 6 must be turned exactly as shown with drain holes toward backboard or your backboard will not be straight 24 Attach Peel Stick Plastic Washers 56 to outside of Middle Arm 24 and Lower Arm 11 as shown in Figure 7A Peel backing from Washers 56 ali...

Page 9: ...46 four Flat Washers 26 four Flat Washers 45 and Lock Nut 33 but do not tighten completely until instructed to do so in Step 19 Make sure that angled end is attached to Upper Arm 6 See Figure 8 and Detail B Figure 8 9 Top Front Sticker 25 46 26 45 33 24 6 ...

Page 10: ...ED TO CURE FOR AT LEAST 3 DAYS Figure 10 Note can be used for leveling system See Step 14 Bottom nuts 35 35 34 36 37 37 35 Bottom Nut 13 Locate hardware needed to mount pole to anchor bolts You will need eight flatwashers 37 four lock Washers 36 four hex nuts 35 and four thread protectors 34 Note Do not remove the nuts you installed in step 2 pg 5 14 Put a flat washer 37 on each anchor bolt Lift p...

Page 11: ...shown attached for clarity not 47 3 22 22 3 5 20 3 5 20 3 47 22 22 11 Note Step Bushings 22 have an adhesive back for ease of assembly peel covering off bushing and stick bushing in hole Place level across as shown in figure 11 If leveling is needed have a second person push up on one end of the backboard and adjust the backboard until level While holding the backboard level tighten hardware from ...

Page 12: ...trip Note To install screws it will be easier if you use a cordless drill with 5 16 socket instead of Phillips head Secure Backboard pads using screws provided 51 as shown in Figure 13 24 25 26 Figure 12 23 Adjust unit to lowest position Use a tape measure to measure from the top of the rim to the playing surface Stick Height Decal 17 to back of Actuator 16 with the measured height mark aligned wi...

Page 13: ... 39 J Bolt REMOVE NUTS 35 Place a level on pole and adjust bottom nuts 35 with a 15 16 open end wrench until pole is level Tighten top 35 hex nuts See Detail D DO NOT 27 28 Secure Post Pad 44 to front of pole by wrapping straps around the back pole and sticking to velcro on opposite side of Pad Top Post Pad straps should be above Post Ears See Figure 14 44 13 Detail D 35 39 35 Bottom ...

Page 14: ...ted to incidental or consequential damages Escalade Sports assumes no other obligations or liability on the part of the purchaser and Escalade Sports neither assumes nor authorizes any other person to assume for it any other liability in connection with the goods sold This warranty shall not apply in any manner to parts or accessories not manufactured by Escalade Sports NOT COVERED BY THIS WARRANT...

Page 15: ...damaged springs bent rings damaged eye bolts and torn or distorted rim supports result from hanging on the rim and are not warranted The goal should not be cranked over 10 Adjustments of the goal should be done under adult supervision When attempting slam dunk activity you should always wear a mouth guard to avoid dental injury RUST MAINTENANCE To ensure ease of operation lubricate all pivot point...

Page 16: ...2L 7252 00 28 29 21 33 26 25 6 23 32 31 30 16 47 3 22 3 5 20 22 22 3 5 20 3 47 22 49 51 48 ...

Page 17: ...6 25 46 26 9 10 3 5 3 4 52 7 3 5 5 3 50 45 4 3 5 5 3 4 5 9 2 15 16 13 14 55 11 4 3 5 5 3 5 42 19 18 3 5 5 5 19 18 3 5 33 44 1 24 41 17 2L 7252 00 12 17 7 8 54 37 53 37 53 53 53 56 5 56 ...

Page 18: ...18 ...

Reviews: