background image

S

TEP 4

PLACE WORKSURFACE ON BASE.
ALIGN TOP SO THAT 1" OVERHANGS
THE FRONT AND 2" TO EACH SIDE.
LEAVING 5" OVERHANG AT THE REAR
OF THE STATION.ATTACH WORK
SURFACE TO BASE USING #14X1 LAG
BOLTS

Before mounting the top down, ensure the cabinet 
is square. Sometimes open top cabinets such as a 
sink base cabinet could shift out of square from the 
weight of the top sitting unevenly. Measuring 
diagonally from outside corners and ensuring the 
measurement is equal is the best was to determine 
square.

Drawers will need to be removed to access the top 
mounting holes in the top of the base. See picture.
With the drawer full extended there will be a 
retaining clip that will need to be disengaged to 
seperate the two halves of the glides. When 
putting the drawer back in, be sure the two halves 
are lined up properly when inserting. Once lined 
up push the drawer all the way in.  This should 
engage the retaining clip.  

S

TEP 3 - Top Instal

INSERT 90 ELBOW THROUGH THE

CUTOUT IN THE WORK SURFACE

FROM THE UNDER SIDE AND ATTACH

TO VAC COVER PORT FROM THE TOP

SIDE BY TIGHTENING THE PIPE

CLAMP WORM GEAR. DO NOT MOUNT

THE PORT COVER YET.

Reviews: