S
TEP 4
PLACE WORKSURFACE ON BASE.
ALIGN TOP SO THAT 1" OVERHANGS
THE FRONT AND 2" TO EACH SIDE.
LEAVING 5" OVERHANG AT THE REAR
OF THE STATION.ATTACH WORK
SURFACE TO BASE USING #14X1 LAG
BOLTS
Before mounting the top down, ensure the cabinet
is square. Sometimes open top cabinets such as a
sink base cabinet could shift out of square from the
weight of the top sitting unevenly. Measuring
diagonally from outside corners and ensuring the
measurement is equal is the best was to determine
square.
Drawers will need to be removed to access the top
mounting holes in the top of the base. See picture.
With the drawer full extended there will be a
retaining clip that will need to be disengaged to
seperate the two halves of the glides. When
putting the drawer back in, be sure the two halves
are lined up properly when inserting. Once lined
up push the drawer all the way in. This should
engage the retaining clip.
S
TEP 3 - Top Instal
INSERT 90 ELBOW THROUGH THE
CUTOUT IN THE WORK SURFACE
FROM THE UNDER SIDE AND ATTACH
TO VAC COVER PORT FROM THE TOP
SIDE BY TIGHTENING THE PIPE
CLAMP WORM GEAR. DO NOT MOUNT
THE PORT COVER YET.