B-5
Field Calibration Procedure
1) Zero gas ranges before attempting calibration. See
previous section ZEROING THE INSTRUMENT
for details.
2) Make sure that the instrument pump is running and
the gas range selected is compatible with the
calibration gas.
Note: A single press of Button One
toggles the pump
Off / On.
3) Remove the cap from calibration gas cylinder.
Make sure that the regulator valve is in the fully
closed position (Off) then connect the gas regulator
to the gas cylinder (push down gently and tighten
clockwise, hand tight). See Figure B-5 for details.
Figure B-5
Connecting Gas
FIELD CALIBRATION
Summary of Contents for Gasurveyor 11-500
Page 1: ...Gasurveyor 11 500 CGI Inert User Handbook...
Page 5: ...iii DECLARATION OF CONFORMITY...
Page 6: ...GASURVEYOR 11 500 USER HANDBOOK iv...
Page 7: ...v REVISION RECORD Date Issue Description Of Change 03 11 06 1 New Handbook...
Page 8: ...GASURVEYOR 11 500 USER HANDBOOK vi...
Page 22: ...GASURVEYOR 11 500 USER HANDBOOK 10...
Page 30: ...GASURVEYOR 11 500 USER HANDBOOK 18...
Page 38: ...GASURVEYOR 11 500 USER HANDBOOK 26...
Page 44: ...GASURVEYOR 11 500 USER HANDBOOK 32...
Page 46: ...GASURVEYOR 11 500 USER HANDBOOK 34...
Page 50: ...GASURVEYOR 11 500 USER HANDBOOK A 4...
Page 60: ...GASURVEYOR 11 500 USER HANDBOOK B 10...
Page 86: ...C 26 GAS MEASUREMENT INSTRUMENTS LTD...
Page 90: ...GASURVEYOR 11 500 USER HANDBOOK IV...
Page 91: ......