C-4
GAS MEASUREMENT INSTRUMENTS LTD.
OPERATION
then Battery status, as shown:
Switch ON (Mode 1)
LEL autoranging to Volume Gas ; Oxygen.
Press and Hold Button One
to switch instrument and pump On. This
initiates the instruments warm-up cycle.
BUTTON 1
BUTTON 2
GASURVEYOR 11-500
ON
OFF
PUMP
ON
OFF
INST.
RANGE
PURGE
ALARM ACK.
Switch ON (Mode 2)
0 to 100% Volume Gas ; Oxygen,
for purge applications.
Press and Hold Button Two
to
switch instrument and pump On.
This initiates the instruments warm-
up cycle.
All LCD segments are displayed
All LCD segments display is
followed by Instrument Type
and Software version,
(
)
Next, the instrument
indicates, as month and
year, when the next
calibration is due.
(February 2002 in
example)
Summary of Contents for Gasurveyor 11-500
Page 1: ...Gasurveyor 11 500 CGI Inert User Handbook...
Page 5: ...iii DECLARATION OF CONFORMITY...
Page 6: ...GASURVEYOR 11 500 USER HANDBOOK iv...
Page 7: ...v REVISION RECORD Date Issue Description Of Change 03 11 06 1 New Handbook...
Page 8: ...GASURVEYOR 11 500 USER HANDBOOK vi...
Page 22: ...GASURVEYOR 11 500 USER HANDBOOK 10...
Page 30: ...GASURVEYOR 11 500 USER HANDBOOK 18...
Page 38: ...GASURVEYOR 11 500 USER HANDBOOK 26...
Page 44: ...GASURVEYOR 11 500 USER HANDBOOK 32...
Page 46: ...GASURVEYOR 11 500 USER HANDBOOK 34...
Page 50: ...GASURVEYOR 11 500 USER HANDBOOK A 4...
Page 60: ...GASURVEYOR 11 500 USER HANDBOOK B 10...
Page 86: ...C 26 GAS MEASUREMENT INSTRUMENTS LTD...
Page 90: ...GASURVEYOR 11 500 USER HANDBOOK IV...
Page 91: ......