2. The installation wall must be vertical and can carry the weight of the inverter. 

3. For the assembly, it is necessary to choose a solid wall or metal construction, which comply the fire 

protection  class  F30  and  the  load  capacity  of  60kg  per  unit.  Relevant  provisions  of  construction 

regulations must be observed! 

4. Mount the device at an appropriate distance from combustible materials. 

5. We recommend that you mount the device at eye level to ensure optimum user comfort. 

6. Owing to its protection type (IP65), the device can also be mounted in outside areas. 

 

Figure 8        Installation patterns 

 

3.3.2 Mounting the Inverter 

There are only two steps to mount the inverter. The first step is fixing the wall bracket, and the second 

step is mounting the inverter. All the steps are shown below by the form of illustration. 

The wall bracket can be fixed to the wall by four expansion bolts (M8*12mm: thread diameter is 8mm, 

nominal diameter is 12mm). Select the appropriate screw types and dimensions for the wall material 

is very important. 

Inverter weight and dimensions are listed as follows: 

 

Description 

GEatom 315/318KTL 

3-phase transformerless grid-tied battery inverter (maximum battery power: 

15/18kW; maximum output power: 18kW) 

Dimension 

540mm x 670mm x 275mm 

Weight 

48 kg 

Summary of Contents for GEatom 315KTL

Page 1: ...GMDE GEatom 315 318KTL Global Mainstream Dynamic Energy Technology Ltd 1 GEatom 315 318KTL Three phase Grid Tied Battery Inverter Version 1 1...

Page 2: ...9 2 1 General System Description 9 2 1 Description of the Device 10 2 2 Outside Dimension of the Device 12 2 3 Technical Data 12 2 3 1 DC Data 12 2 3 2 AC Data 13 2 3 3 General Data 13 3 Installation...

Page 3: ...31 4 2 5 Setting Menu Display 31 4 2 6 Inv Info Menu Display 31 4 3 Settings 32 4 3 1 Language Setting 33 4 3 2 Clock Setting 33 4 3 3 Password Setting 34 4 3 4 Battery Setting 35 4 3 5 Clear Data 37...

Page 4: ...t of GMDE Read this user manual before you start Thank you for purchasing our products this battery inverter is highly reliable and efficient due to its convenient design and excellent quality This th...

Page 5: ...It is especially important to be familiar with the general safety rules for working with electrical equipment 1 2 Safety Rules General introduction These safety related guidelines use the following AN...

Page 6: ...r handling Personal injury by crushing shearing cutting or striking CAUTION Cancellation of the operating license If the GMDE inverter is operated with a wrong country code the electric supply company...

Page 7: ...it at least 15 minutes before proceeding after disconnecting the battery inverter from AC grid and battery packs Operating the inverter Do not commission the device until the overall system complies w...

Page 8: ...to property any personal injury any damage or injury arising from or as a result of misuse or abuse or the incorrect installation integration or operation of the product We disclaim any liability for...

Page 9: ...ter communicates with the power meter that is installed between the AC grid and the customer load With the power related information sent from the power meter the battery inverter can automatically de...

Page 10: ...he detailed communication protocol please contact us at service global mde com Note Maximum Charging current Maximum Discharging current Discharging Stop Voltage and Charging Stop Voltage should be se...

Page 11: ...e AC output connector which connect to AC grid Rated conductor size 6 mm 2 Two pairs of battery input terminals each input pair consists of positive and negative terminals Integrated DC switch to swit...

Page 12: ...Power Operating Voltage Range Vdc 417 800 460 800 Charging Upper Limit Voltage Vdc Being adjustable according to actual battery packs configuration as long as not exceed the input voltage range Disch...

Page 13: ...130 Table 2 Specifications of GMDE GEatom 315 318KTL 2 2 3 3 General Data MODEL LIST GEatom 315KTL GEatom 318KTL EFFICIENCY Max Charging Discharging Efficiency 97 97 PROTECTION DC disconnect DC fuse S...

Page 14: ...or fuse is installed between battery packs and battery inverter Note A DC switch is already integrated into the battery inverter this DC switch cannot been used to directly switch off the inverter whe...

Page 15: ...n be removed safely for maintenance 3 2 Unpacking 3 2 1 Packing List The following items are included in the GMDE battery inverter package 1 GMDE GEatom 315 318KTLx 1 2 User Manual x 1 3 Certificate o...

Page 16: ...GMDE GEatom 315 318KTL Global Mainstream Dynamic Energy Technology Ltd 16 Figure 6 Front panel of GMDE GEatom 315 318KTL...

Page 17: ...GMDE GEatom 315 318KTL Global Mainstream Dynamic Energy Technology Ltd 17 3 2 3 Identifying the Inverter...

Page 18: ...Dynamic Energy Technology Ltd 18 Figure 7 Label of GMDE GEatom 315 318KTL 3 3 Mounting 3 3 1 Assembly Site Requirements 1 The assembly site must be shaded so that the inverter can achieve the highest...

Page 19: ...ction type IP65 the device can also be mounted in outside areas Figure 8 Installation patterns 3 3 2 Mounting the Inverter There are only two steps to mount the inverter The first step is fixing the w...

Page 20: ...position and insert all screws 4 Fix the wall bracket to the wall by turning the screws The diagram of mounting the wall bracket is showed below Figure 9 Inverter wall bracket installing Hang the inv...

Page 21: ...4 1 Connectors The GMDE inverter is provided with the following connectors as shown below from left to right 1 Two pairs of battery input terminals 2 Integrated DC switch 3 Communication interface in...

Page 22: ...double check to ensure that the DC switch is turned off before your connection 2 Insert battery cables into the battery terminals Figure 12 DC connection battery input terminals 3 4 3 AC Connection Th...

Page 23: ...se find the recommended AC output cable size Do not use cables of which losses exceed 1 L1 Line 1 L2 Line 2 L3 Line 3 N Neutral G PE 6mm 2 The detailed installation procedures of this AC output termin...

Page 24: ...RS485 is for external communication and USB is mainly for firmware update Please refer to the following procedures of the communication connection of inverter Figure 16 Communication connection commun...

Page 25: ...n is only for the Integrated Energy Management Solution in section 2 1 General System Description The wire connection of power meter is shown as below 1 Connect the AC grid to the power meter on the m...

Page 26: ...atom 315 318KTL Global Mainstream Dynamic Energy Technology Ltd 26 Wire connection Connecting direction RS485 connection 1 RS485 connection 2 Figure 19 Wire connection of power meter Back to Top From...

Page 27: ...he functions of the navigating keys and indication lightings around the LCD screen are displayed in the following Figure 20 LCD display Table 5 Function introduction Item Symbol Meaning Illustration U...

Page 28: ...enu of LCD Table 6 Main menu illustration Press key on the Figure 21 main menu and then enter into the following selection menu on which more detailed information could be found Item Description Opera...

Page 29: ...enu 4 2 2 Energy Menu Structure In the Energy submenu all the historical data information can be found By pressing on the Figure 22 main selection menu the screen enters into Energy menu In the Energy...

Page 30: ...play The current operating status information could be found in the Run Info menu By pressing on the Figure 22 main selection menu the screen enters into Run Info menu as shown in Figure 24 Figure 24...

Page 31: ...4 Fault Alarm Menu Display The fault and alarm information of the inverter operation is included in this menu Detailed description of the faults and warnings information can be found at section 5 3 Fi...

Page 32: ...nd clear data Press key into the main selection menu from main menu Figure 28 Main selection menu While selecting setting on the main selection menu and pressing to enter into the setting menu a messa...

Page 33: ...g Press into the default Language setting page Use the navigating keys to select the language The default language is English Figure 31 Language setting Press OK button to finish the password input Pr...

Page 34: ...t the local time Figure 33 Clock setting Press OK button to finish the password input Press Back button to return 4 3 3 Password Setting While pressing key on the main setting window the screen enters...

Page 35: ...he service center of GMDE who will help you to resume the initial password 4 3 4 Battery Setting While pressing key on the main setting window the screen enters into Bat Setting Figure 35 Selecting Ba...

Page 36: ...Setting not successful d Setting successfully e Not supported at solution 2 f Not supported during the inverter running Figure 36 Battery setting After setting the parameters of the battery packs shu...

Page 37: ...ecting Clear Data A confirmation message box as Figure 38 will pop up Figure 38 Message box of Clear Data Press OK button to delete all the historical data Press Back button to cancel 4 4 Fault Warnin...

Page 38: ...box will pop up Figure 40 Energy data deleting Press Yes button to delete the historical data in this page Press No button to cancel 2 On the Fault Alarm menu window by pressing keys at the same time...

Page 39: ...ault having been present for more than 15 minutes and cannot be acknowledged by inverter s auto restart Unlike permanent failure a transient failure is automatically acknowledged by the inverter The i...

Page 40: ...The master frequency is out of tolerable range Check system frequency and line voltage Service if system frequency is within normal range No Utility Grid voltage 0 Re measure line voltage Service if l...

Page 41: ...en Wait until the controller has re stabilized Boost Start Warning Time limit exceeded of DC bus soft start Acknowledge error Contact the service if the error occurs repeatedly DC Over Power DC power...

Page 42: ...arnings and actions Fault messages Explanation Action Curr Sensor Fault The Current sensor is abnormal Service Inverter Curr Fail Inverter current is over the tolerable value Service Bus Low Fail DC b...

Page 43: ...nowledged after the cause of the fault has been eliminated To acknowledge the fault messages press the OK key or turn the GMDE inverter off with the DC switch Wait for a while and turn the device on a...

Page 44: ...n 3 1 Operation Sequence 6 2 Visual Inspection You should conduct visual inspection at least once a year The visual inspection includes checking the machine cover interface and screen 6 3 DC Switch Ye...

Page 45: ...Contact If you have any questions about our product please contact us GMDE Room 604 605 Tongpu Road No 1220 Putuo District Shanghai 200333 P R China TEL 86 21 60710809 818 FAX 86 21 61730300 E mail S...

Reviews: