
Checklist
21
Checklist
Please check the following conditions in order to ensure a trouble-free installation of the equipment:
1.
Delivery of the crate and transport to the installation site
YES
NO
A.
Is there a place indoor where the crated equipment can be stored
temporarily?
o
o
B.
Is there a hand-powered pallet mover, a fork-lift truck or any other lifting
device available? Please refer to "Lifting the crate" on page 1 for required
lifting equipment.
o
o
C.
Can the crate be transported directly to the installation site? See "Required
width of passage and doorways" on page 1
o
o
D.
Is it necessary to unpack the equipment before it is transported to the
installation site? See "Required width of passage and doorways" on page 1
o
o
E.
Are there other factors (stairs, elevators, corners, obstacles, etc.) which
should be taken into account when transporting the equipment?
If YES, please describe:
o
o
2.
Power supply
YES
NO
A.
Make a note of the present supply specifications:
Number of phases:
Neutral wire?
o
Voltage (V):
Earth wire?
o
Fused by (Amps):
Frequency (Hz):
B.
Has a connection box been provided to connect the equipment to the mains?
o
o
C.
Has the customer been asked to provide for all supplies (cables, fuses, etc.)
necessary to connect the equipment to the mains?
o
o
D.
Is there a house electrician available?
o
o
E.
Are there any known problems in the building where the equipment will be
installed?
If YES, please describe which:
o
o
May, 2022
Pre-installation Guide
|
Flex-i-Line 520 (XP) Dry/Compact/Standard/Max
Summary of Contents for Flex-i-Line 520
Page 2: ...2 Blank Pre installation Guide Flex i Line 520 XP Dry Compact Standard Max May 2022 ...
Page 6: ...Pre installation Guide Flex i Line 520 XP Dry Compact Standard Max May 2022 ...
Page 12: ...Pre installation Guide Flex i Line 520 XP Dry Compact Standard Max May 2022 ...
Page 20: ...Pre installation Guide Flex i Line 520 XP Dry Compact Standard Max May 2022 ...