
0020054593 - 03/11 - Glow-worm
- 19 -
ANY ASSISTANCE ?
Filling Central Heating System
1. Ensure that the filling loop flexible hose
is securely connected to the double check
inlet valve, see diagram.
2. Fully open tap "A", then gradually
open tap "B" to fill the heating system to a
pressure of 1.0bar. When completed close
the filling taps.
3.
IMPORTANT
: To comply with the water
regulations the flexible hose must be
disconnected from the double check inlet
valve - undo the nut and pull the flexible
hose from the valve.
9.3 Appliance safety devices
9.4 Boiler Shutdown
The boiler software is designed to
recognise the potential for an overheat
lockout and will shutdown before this
happens.
• To restart the boiler, press the reset
button, see chapter "How to use your
appliance ► Overview".
If the boiler fails to resume normal
operation and all external controls are
calling for heat, then call your Installation/
Servicing company or Glow-worm service.