background image

4

2000225231B

500mm

Additional clearances may be
required for installation

65mm

6mm

6mm

FRONT

VIEW

100mm

0081M

SIDE OR
REAR FLUE
5mm

5mm

Diagram 2

Instructions for Use

Boiler Electrical Supply

WARNING:

  This boiler must be earthed.

The boiler must only be connected to a 230V~50Hz supply
protected by a 3A fuse.

All system components shall be of an approved type and shall
be connected in accordance with the current issue of BS7671
and any applicable local regulations.

External wiring must be correctly earthed, polarised and in
accordance with the relevant standards.

In GB this is BS 6891.

In IE this is the current edition of I.S.813 "Domestic Gas
Installations".

Wiring to the boiler must be PVC insulated type to the current
issue of BS6500 Table 16, not less than 0.75mm

2

 (24/0.20mm).

The colours of three core flexible cable are:

Brown - live, Blue - neutral,

Green/yellow - earth.

As the markings on your plug may not correspond with these
colours continue as follows:

The cable coloured blue must be connected to the terminal
marked “N” or black.

The cable coloured brown must be connected to the terminal
marked “L” or red.

The cable coloured green/yellow must be connected to the
terminal marked “E”, or green or the earth symbol     .

To Light the Boiler

WARNING:

  Sealed Systems

Do not operate the boiler wthout water.

A sealed water system must be filled and pressurised by a

competent person

.

Only light the boiler when you are sure that the system has been
filled and pressurised.

The pressure gauge should show at least 0.7bar, anything less
than this figure could indicate a leak and you MUST contact your
installation/servicing company.

If there is any doubt about the boiler being full of water consult
your installation/servicing company.

ALL SYSTEMS:

Turn the electrical supply on to the boiler and check that all
remote controls are calling for heat.

To Turn the Boiler On

Remove the controls cover, by withdrawing it forward and off,
see diagram 1.

Turn the control thermostat knob clockwise to any position
between MIN and MAX.  The maximum temperature setting is
about 82

o

C (180

o

F), see diagram 1.

The boiler lighting operation is now automatic as follows.

The fan operates, followed by an ignition spark until the pilot is
lit.  When the pilot is alight the ignition system switches off and
the main burner lights.  The flames can be seen through the
viewing window, see diagram 1.

The main burner will remain alight until switched off by the
control thermostat or any remote control.

If the boiler is switched OFF, by hand, wait at least 30 seconds
before switching on again.

When the boiler switches off, both the pilot and main burner go
out.

The automatic lighting sequence will operate again when heat
is required.

Refit the controls cover.

It should be noted that this is a fan flue appliance and fan
operation may be heard.

To Turn the Boiler Off

For short periods, turn the control thermostat knob anti-clockwise
to “O” Off.  To relight, turn the control thermostat knob to any
position between “MIN” and “MAX”.

For longer periods, turn the control thermostat knob fully anti-
clockwise to “O” Off and switch off the electrical supply to the
boiler.

To relight follow the lighting sequence given above.

Protection Against Freezing.

If the boiler is to be out of use for any long period of time during
severe weather conditions we recommend that the whole of the
system, including the boiler, be drained off to avoid the risk of
freezing up.  Make sure that, if fitted, the immersion heater in the
cylinder is switched off.

For the position of the serial number, see diagram 1.

Summary of Contents for Ultimate 40FF

Page 1: ...iler This is a Cat I2H Appliance BS 6332 BS 5258 Reference in these instructions to British Standards and Statutory Regulations Requirements apply only to the United Kingdom For Ireland the rules in f...

Page 2: ...N PADS These can cause irritation to skin eyes and the respiratory tract If you have a history of skin complaint you may be susceptible to irritation High dust levels are usual only if the material is...

Page 3: ...the reset button as in Electrical Supply Failure If the overheat operates again turn the appliance off and contact your installation servicing company Maintenance To ensure the continued efficient and...

Page 4: ...l of water consult your installation servicing company ALL SYSTEMS Turn the electrical supply on to the boiler and check that all remote controls are calling for heat To Turn the Boiler On Remove the...

Page 5: ...The manufacturer s instructions supplied The Gas Safety Installation and Use Regulations The appropriate Buildings Regulations either The Building Regulations The Building Regulations Scotland The Bu...

Page 6: ...or and must be fused 3A maximum This method of connection must be by a fused doublepoleisolatingswitch withaminimumcontactseparation of 3mm on both poles The switch should be readily accessible and pr...

Page 7: ...pipework At least a minimum clearance of 500mm must be left in front of the boiler for servicing see diagram 1 3 1 13 Room Ventilation The boiler is room sealed and does not require the room or space...

Page 8: ...those detailed in I S 813 Domestic Gas Installations The terminal must be exposed to the external air the position allowing free passage of air across it at all times Car ports or similar extensions...

Page 9: ...vent are as shown in diagram 3 2 The unrestricted open vent from the boiler must rise continuously to discharge over the feed and expansion cistern 3 5 Domestic Hot Water System General All domestic...

Page 10: ...H LOCKSHIELD VALVE FLOW RET There must always be a cold water path to the return connection of the boiler PUMPED RETURN PUMPED FLOW 4124 Diagram 3 4 1metre Min 27 metres Max 22mm VENT 15mm COLD FEED T...

Page 11: ...em design pressure of 0 7bar the minimum total vessel volume required is 0 063xTotal System volume NOTE Ahigherinitialdesignpressurerequiresalargervolume expansion vessel The charge pressure must not...

Page 12: ...BREAKER PRESSURE REDUCING VALVE 0051M Diagram 3 6 3 16 Filling a Sealed Water System Provision for filling the system at low level must be made Three methodsareshownindiagram3 6 Theremustbenopermanen...

Page 13: ...ILER 4 1 Unpacking Open the carton check the items supplied against the boiler pack contents list on the flap and diagram 4 1 4 2 Flue Position and Length Determine flue application length and termina...

Page 14: ...ptionalwalllinerkitisusedthefluecan be fully installed from the inside For a wall thickness of over 300mm the external flue hole will need to be made good from the outside This applies also if you use...

Page 15: ...ram 4 5 Drill holes and plug to suit No 12x2in wood screws fit the screws allowing sufficient clearance about 5mm to accept the swing brackets see diagram 4 5 Secure the mounting bracket to the wall w...

Page 16: ...ue manifold secure with the two self tapping screws supplied in the loose items pack It should now not be possible to remove the manifold 4 10 Rear Fitting Fit the self adhesive foam seal provided in...

Page 17: ...iler is not to be fitted for some time cover the hole in the wall On limited access installations push the flue assembly into the hole such that it is within the wall and does not stick out into the r...

Page 18: ...m the fan see diagram 5 4 Break the air pressure switch tube connections see diagram 5 4 Remove the fan assembly by removing the screws at the front slackening the screws at the rear and sliding it ou...

Page 19: ...oiler must be earthed Take care not to damage any internal wiring and capillaries Take the plastic cable retaining clip from the loose items pack peel off the backing paper and position it in a suitab...

Page 20: ...TRATED VERTICAL REAR RIGHT LEFT SCREW 2 JUBILEE CLIP Cutting MARK lengths Lefthand flue does not require cutting SIDE LEFT FAN DUCT EXTENSION SIDE RIGHT REAR FLUE ELBOW FAN DUCT EXTENSION FAN DUCT EXT...

Page 21: ...INS SUPPLY FUSED AT 3 AMP g y E N K1 K2 PN g y CHASSIS EARTH br b r P SWITCH CONTROL TIME SWITCH PROGRAMMER ETC when fitted remove red link br b L E N CIRCULATON PUMP Any external controls must only b...

Page 22: ...control thermostat is turned to O the Off position Turn the gas service cock On see diagram 6 1 Testthepilotsupplytubeanditsconnectionsforgassoundness as follows Disconnect the ignition lead from the...

Page 23: ...pen refer to fault finding Section 9 1 4 To carry on turn the gas service cock On see diagram 6 1 When the boiler switches Off both the pilot and main burner go out The automatic lighting sequence wil...

Page 24: ...n UNDER NO CIRCUMSTANCES SHOULD THIS VALVE BE LEFT IN THE FULLY CLOSED POSITION 6 8 Sealed Water Systems ONLY Adjust the system to initial design pressure The set pointer on the pressure gauge should...

Page 25: ...n the particular installation conditions and usage but in general once a year should be enough It is the Law that any servicing is carried out by a competent person Before servicing turn off the gas a...

Page 26: ...ected and cleaned as necessary see diagram 8 5 If removing for cleaning do not use a wire or sharp instrument on the hole Use a little suitable sealant on the external thread when refitting to make su...

Page 27: ...tinuity polarity short circuit and resistance to earth checks must be repeated using a suitable multimeter Refer to neon indicators An Aid to Fault Finding diagram 9 1 Boiler Fault Finding diagram 9 2...

Page 28: ...oard With pilot lit does spark stop Isolate supply test harness and replace as required Is there 230V between main multi functional control solenoid black and blue cables YES Replace multi functional...

Page 29: ...is applied Pump Overrun Operation For Fully Pumped System Only The PCB has a timed pump overrun facility The pump should run for several minutes after remote controls have stopped calling for heat Bef...

Page 30: ...if no switch is fitted link will make the circulation pump run constantly F1 F2 or or or p Diagram 9 4 Diagram 9 5 FUSE TYPE F1 F2 F1A SPARK ELECTRODE O H CUTOFF CONTROL STAT FAN AIR PRESSURE SWITCH P...

Page 31: ...ntral heating system remote controls and not to control box Yellow link fitted to bridge out the overheat cutoff b g y E N g y K1 K2 ELECTRODE PN 5859 GRAVITY DOMESTIC HOT WATER AND PUMPED CENTRAL HEA...

Page 32: ...AT 3 AMP N E N g y br CIRCULATON PUMP L r See Note SL P PN FULLY PUMPED OPEN VENTED OR SEALED WATER SYSTEM 5860 b N b br b MULTI FUNCTIONAL CONTROL br b Remove red link between 9 and SL when fitting a...

Page 33: ...roof washers in the front of the control box Remove the split pin and withdraw the thermostat phial from its pocket Releasethecapillaryfromthebaseandplasticretaining clip then remove it from the split...

Page 34: ...control thermostat and earth connection Release the main terminal strip and plastic label Carefully pull the board away from its supports When refitting refer to wiring diagram 9 6 or 9 7 as appropria...

Page 35: ...ts 10 8 Solenoid diagram 10 3 Remove the electrical plug from the multifunctional control Remove the securing screw and then the solenoid Assembly 10 9 Main Burner Remove the main burner as Section 8...

Page 36: ...emoved the rear insulation can be removed and replaced 10 12 Viewing Window diagram 10 6 Remove the old self adhesive aluminium foil gasket and the old mica window Replace with a new mica window Peel...

Page 37: ...e sure that the plastic tubes arefittedasshownindiagram10 7andthatelectricalconnections are made as shown in diagrams 9 6 or 9 7 10 14 Fan diagram 5 4 Remove the electrical connections and disconnect...

Page 38: ...C number of the appliance and part Key No Part No Description GC Part No 1 203374 Multifunctional control 2 208040 O ring 334 592 3 205708 Injector 40FF 313 944 4 203431 Pilot burner 379 204 5 2000801...

Page 39: ...39 2000225231B Diagram 11 1 5861 1 2 6 4 5 10 9 8 7 11 13 14 15 3 11 Spare Parts...

Page 40: ...40 2000225231B Because of our constant endeavour for improvement details may vary slightly from those shown in these instructions...

Reviews: