13
2000225231B
4 Flue and Appliance Preparation
Diagram 4.1
Diagram 4.2
Diagram 4.3
Standard Flue terminal illustrated.
Standard Flue terminal illustrated.
6827
6828
REAR FLUE LENGTHS
Distance R = Wall thickness
STD.
75mm to 505mm
1M
75mm to 1015mm
2M
75mm to 2015mm
3M
75mm to 2995mm
SIDE FLUE LENGTHS
Distance S = External wall face to boiler case
STD.
81mm to 513mm
1M
81mm to 1023mm
2M
81mm to 2023mm
3M
81mm to 3003mm
4791
CARTON
TOP
LOOSE
ITEMS PACK
WALL
TEMPLATE
INSTRUCTIONS
MOUNTING
BRACKET
BOILER
4.1 Unpacking
Open the carton, check the items supplied against the boiler
pack contents list on the flap and diagram 4.1.
4.2 Flue Position and Length
Determine flue application, length and terminal position before
starting.
Refer to diagram 4.2 or 4.3.
If you are using a Flue Bend or a Vertical Flue Kit, please follow
the instructions supplied with that kit.
To make a neat finish to the flue outlet a flue collar kit, part
No.443286, with instructions, is available.
NOTE:
the use of this collar will mean that the flue lengths will
need to be altered, full instructions are given in the kit.
NOTE:
If required, an optional Wall Liner Kit, Part No. 900862,
is available, complete with fixing instructions.