13
Installation/Operation & Maintenance Manual
GM
-
6140H
2-POST LIFT
4.3 FLOOR
The lift must be installed on a horizontal concrete
bed with a minimum thickness of 200mm built and a
resistance ≥30N/mm
2
.
The floor must also be flat and level (10mm of
tolerance for leveling). Consult the manufacturer
with regard to special applications.
Fig. 30
4.4 ASSEMBLING
WARNING
DURING INSTALLATION ONLY AUTHORISED
PERSONNEL IS ALLOWED.
To assemble the lift, the weight of the various parts
is to be considered, in order to provide a lifting
machine with the minimum capacity 500kg and max.
lifting height of 2900mm.
Before starting to assemble the lift, check the crate
contains all the needed material.
4.4.1 POST ASSEMBLING
◆
Install both boards on the bases, keep the main
column upright, and put the stiffs which are no
less than 100mm on the upside for the
convenience of installing the safety device,
cable, hose and wire.
◆
Install the balance cable according to
Fig. 31
.
The cable also can be crossed from the hole on
the board before the fixing of both columns.
Fig. 31
◆
Connect the high-pressure hose according to
Fig. 32
and
Fig. 33
. First connect the hose with
tri-joint under the main column and the bend
under the sub-column. Fix them after upright
the columns.
Fig. 32
Fig. 33
◆
Hold up both columns (keep the carriage lock
and in the same level), and then fix the bolts on
the base.
Summary of Contents for GM - 6140H
Page 27: ......