12
Installation/Operation & Maintenance Manual
GM
-
6140H 2-POST LIFT
Chapter 4 INSTALLATION
THE FOLLOWING OPERATIONS MUST BE
PERFORMED EXCLUSIVELY BY SPECIALISED
TECHNICAL STAFF WITH AUTHORISATION
FROM THE MANUFACTURER OR LICENSED
DEALER.
IF
THESE
OPREATIONS ARE
PERFORMED BY OTHER PERSONS, SERIOUS
PERSONAL INJURY AND/OR IRREPERABL
DAMAGE TO THE LIFT UNIT MAY RESULT.
4 . 1
I N S T A L L A T I O N
R E Q U I S I T E
CHECKLIST
The lift is designed for installation in enclosed areas
suitably protected from the weather. The place of
installation must be well clear of areas destined to
washing or painting, and away from solvent or paint
storage areas or areas where there is a risk of
potentially explosive atmosphere.
SUITABILITY OF THE DIMENSIONS OF THE
PLACE OF INSTALLATION AND SAFTY
CLEARANCE.
The lift must be installed in observance of the
clearances between walls, pillars, other machines,
etc. indicated in figure 26 and incompliance with any
legislative requirements in the county of installation.
Check in particular:
◆
Minimum height:
5000mm inclusive of height
of vehicle, maximum height of arms, (i.e.
1900mm), and upper post height (i.e. 2828mm)
◆
Min. distance from walls:
600mm
◆
Min. working area:
700mm
◆
Area for command station
◆
Area for maintenance, access and emergency
escape routes.
◆
Position in relation to other machines
◆
Proximity to power supply for trouble-free hook-
up
Fig. 28
Fig. 29
4.2 LIGHTING
All parts of the machine must be uniformly lit with
sufficient light to assure that the adjustment and
maintenance operations specified in the manual can
be performed, and without areas of shadow
reflected light, glare and avoiding all situations that
could give rise to eye fatigue.
The lighting must be installed in accordance with the
laws in force in the place of installation
(responsibility lies with the lighting equipment fitter).
Summary of Contents for GM - 6140H
Page 27: ......