Door
Wall
Side
Top View
#1
#2
#3
INSTALLING VERTICAL TRACKS
Step 1
Stand door panel upright central to garage door opening.
Ensure that there is an even overlap on either side. Mark a
point 10mm past either end. Using a straight edge pencil a
vertical line on both sides of the opening.
IMPORTANT make sure that the floor is level. If the
floor is not level pack door and vertical tracks to level.
Step 2
Loosely fasten the wall fix brackets to each vertical track
using the 1/4' x 5/8’ screws and nuts as shown. The screw
heads must be inside the track. The smaller wall bracket is
fixed to the bottom of the track, with the larger bracket
above. IMPORTANT ensure the flat edge of the track is facing
the wall.
Step 3
Attach the flag brackets to the top of the track with the 1/4'
x 5/8’ screws and nuts, once again screws heads must be
inside the track. Refer Fig. 3.
Top
Bottom
Step 4
Install each vertical track to garage wall using suitable fixings,
align inside edge of each track with pencilled line as detailed
in Step 1.
SETTING UP THE DOOR PANELS
Step 5
Select door panel with weatherseal pre-installed to bottom
edge. Place this panel face down on a soft support. (e.g
two padded saw horses).
Step 6
Attach the bottom cable bracket to each bottom corner of
the panel using 1/4' metal screws. Hook one cable over steel
extrusion either end.
Bottom
Top
Step 7
Using the number 1 hinge attach a hinge to each rigid
vertical section of the panel. Ensure hinge is face down and
level with top edge of the panel. Refer Fig. 7.
Fig. 1
Fig. 4
Fig. 5
Fig. 6
Top
Fig. 3
Fig. 2