Page 11
15 mm
discharge
pipe
Expansion
relief valve
Typical Discharge Pipe Arrangement
Dotted line showing
alternative route with
single tundish being used
500 mm max.
P & T
Relief
Valve
300 mm
min.
22 mm metal pipe with continuous
fall up to 9m equivalent length (D2).
NOTES
:
The discharge will consist of scalding
waterand steam. Asphalt, roofing felt
and non-metallic rainwater goods may
be damaged by such discharges.
It is not acceptable to discharge straight
into a soil pipe.
Discharge below
fixed grating
Fixed Grating
Trapped gully
Pressure & Temperature/expansion Relief
Valve Pipework
The relief valve should be installed to discharge
in accordance with G3 of the Approved
Document of the Building Regulations and
should be piped to where it is visible, but will
not cause danger to persons or damage to
materials.
The following information is taken from
Approved Document G3 of the Building
Regulations and is provided to assist with
the design and installation of the discharge
pipework. However, the information is not
exhaustive and reference should always be
made to Approved Document G3 of the Building
Regulations. The fi nal decision regarding any
arrangements rests with Building Control and
it is recommended that their advice is sought
if you have any concerns regarding this aspect
of the installation.
The two safety valves will only discharge
water under fault conditions. When operating
normally water will not be discharged.
The tundish should be vertical, located in the
same space as the unvented hot water storage
system and be fi tted as close as possible and
within 500mm of the safety device e.g. the
temperature relief valve.
The discharge pipe (D2) from the tundish should
terminate in a safe place where there is no risk
to persons in the vicinity of the discharge, be
of metal and:
a) Be at least one pipe size larger than the
nominal outlet size of the safety device unless
its total equivalent hydraulic resistance
exceeds that of a straight pipe 9m long
i.e. discharge pipes between 9m and 18m
equivalent resistance length should be at
least two sizes larger than the nominal outlet
size of the safety device, between 18 and
27m at least 3 sizes larger, and so on. Bends
must be taken into account in calculating
the fl ow resistance. Refer to the table and
the worked example.
A n a l t e r n a t i ve a p p r o a c h fo r s i z i n g
discharge pipes would be to follow BS6700
Specifi cation for design installation, testing
and maintenance of services supplying water
for domestic use within buildings and their
curtilages.
b) Have a vertical section of pipe at least
300mm long, below the tundish before any
elbows or bends in the pipe work.
c) Be installed with a continuous fall.
Worked Example
The example below is for G1/2 temperature relief valve with a discharge pipe (D2)
having 4 elbows and length of 7m from the tundish to the point of discharge.
From Table 1:
Maximum resistance allowed for a straight length of 22mm copper discharge
pipe (D2) from a G1/2 temperature relief valve is: 9m subtract the resistance for
4 x 22mm elbows at 0.8m each = 3.2m.
Therefore the maximum permitted length equates to: 5.8m.
5.8m is less than the actual length of 7m therefore calculate the next largest size.
Maximum resistance allowed for a straight length of 28mm pipe (D2) from a G1/2
temperature relief valve equates to: 14m.
As the actual length is 7m, a 28mm (D2) copper pipe will be satisfactory.
Table 1: Sizing of copper discharge pipe ‘D2’ for a temperature relief
valve with a G1/2 outlet size (as supplied)
Size of discharge
pipework
Maximum length of
straight pipe
(no bends or elbows)
Deduct the fi gure
below from the
maximum length for
each bend or elbow in
the discharge pipe
22mm
Up to 9m
0.8m
28mm
Up to 18m
1m
35mm
Up to 27m
1.4m
INSTALLATION
INSTALLATION
Summary of Contents for StainlessLite HP180IND
Page 17: ...Page 17 INSTALLATION INSTALLATION ...
Page 26: ...Page 26 BENCHMARK ...
Page 27: ...Page 27 BENCHMARK ...
Page 28: ...Page 28 NOTES ...
Page 29: ...Page 29 NOTES ...