background image

Where we agree to rectify any defect, we reserve the right to undertake the
work on our own premises.  Provided that our product has been installed
in accordance with any instructions for installation and any relevant codes
of pratice and in accordance with the bye-laws and requirements obtaining
in any particular area we give the following warranties:

(1)  Domestic and Commercial Open Vented Cylinders and Tanks.
If the copper cylinder or tank or any integral pipework proves to be
defective either in materials or workmanship, we will either repair or supply
replacement at our option with the closest substitute in the case of any
obsolete product to any address in Great Britain.
(a)  free of all charge during the first year after delivery by us.
(b)  thereafter at a charge of one-tenth of the then current list price and
any copper price supplement and delivery charge during the second year
after delivery by us and increasing by a further one-tenth on the second and
subsequent anniversary of delivery by us.
AND FURTHER we will meet the contractors/installers reasonable costs
in removing and replacing any defective Open Vented Copper Cylinder or
Tank with defective integral pipework as follows:
(i)  in the case of vessels of less than 80 imperial gallons capacity up to a
maximum of one-half of the extent of our liability in regard to the
replacement product expressed in (1) (a) and (b) above
ii)  in the case of vessels larger than 79 imperial gallons capacity up to a
maximum of one-quarter of the extent of our liability in regard to the
replacement product as expressed in paragraphs (1) (a) and (b) above.
(2)   Domestic Mains Fed Products
 If the copper storage vessel itself or any integral pipework as part of the
storage vessel assembly proves to be defective either in materials or
workmanship, we reserve the right to either repair or supply replacements
or the closest possible substitute in the case of any obsolete product and will
collect and deliver to any address in England, Wales and Scotland (excluding
all Scottish Islands).
(a) free of all charge during the first year after delivery by us.
(b) thereafter at a charge of one-fifth of the then current list price or any
copper price supplement and delivery charge during the second year after
delivery by us increasing by a further one-fifth on the second and subsequent
anniversary of delivery by us.
AND FURTHER we will meet the contractors/installers reasonable costs
in removing and replacing any defective copper storage vessel or storage
vessel with defective integral pipework from the Domestic Mains Pressure
Range of products up to a maximum of one-third of the extent of our
liability in regard to the replacement product expressed in (2) (a) and (b)
above.
(3)  Components of our products other than Storage Vessels and Integral
Pipework.  We will either extend to the purchaser the same terms of
warranty as we are given by the manufacturer of the component or if the
manufacturer does not give any warranty, replace free of charge any
component which becomes defective within twelve months after the date
of the delivery by us and is returned to us at the purchaser's expense but we
shall not meet the cost of removal or shipping or return of the component
or any other cost charges or damages incurred by the purchaser.
(4)  In the case of the Gulfstream range of products any heat generator found
to be defective and admitted to be such by us either as regards materials or
workmanship within 12 months from date of installation or 18 months
from date of manufacture whichever is the sooner, will be repaired or
replaced at our option.AND FURTHER we will meet the contractors/
installers reasonable costs in removing and replacing any defective heat
generator up to a maximum of one-third of the extent of our liability in
regard to the replacement product.
(5)  In the case of goods manufactured solely in accordance with our
specification and designs and in respect of any installation work carried out
by or on our behalf, our entire liability and the purchaser's sole remedies
(subject to (1-4) above) and shall be as follows:
(a) we accept liability for death or personal injury to the extent that it results
from our negligence that of our employees agents or subcontractors.
(b) subject to paragraph (d) below, we accept liability for direct physical
damage to tangible property to the extent that such damage is caused by
our negligence that of our employees agents or subcontractors.
(c) our total liability to the purchaser over and above any liability to replace
under
 (1 - 4) above (whether in contract or in tort including negligence) in respect
of any one cause of loss or damage claimed to result from any breach of
our obligations hereunder, shall be limited to actual money damages which
shall not exceed £20,000 provided that such monetary limit shall not apply
to any liability on the part of ourselves referred to in paragraph (a) above.

                     

AMD. SEPTEMBER 1994

1.   We only do business upon the Conditions which appear below and no
other.  Unless we so agree in writing these Conditions shall apply in full to
any supply of goods by us to the exclusion of any Conditions or terms sought
to be imposed by any purchaser.  These Conditions of Sale and Warranty
Terms override those which are contained on the Invoice Forms and all
Sales are now subject to these Conditions of Sale and Warranty terms only.

2.  PRICE
Orders are accepted at the price ruling at the date of receipt of order , this
price is our last published list price plus a supplement to allow for any
increase in the price of copper between the dates of publication of our price
lists ("the copper price supplement").  An order may not be cancelled or
varied after acceptance without the written consent of the company.  Such
cancellation or variation shall be subject to such reasonable charges as may
be appropriate.

3.  SPECIFICATION
The goods are supplied in accordance with the Specifications (if any)
submitted to the Purchaser and any additions and alterations shall be the
subject of an extra charge.  Any goods not so specified shall be in accordance
with our printed literature or the literature of any of our component
suppliers (subject to any modifications made since publication).  If we adopt
any changes in construction or design of the goods, or in the specification
printed in our literature, the Purchaser shall accept the goods so changed
in fulfilment of the order.

4.  PAYMENT
The invoice price of goods shall be payable within 30 days of despatch by
us of our invoice for the goods or such longer time as may be stated by our
quotation or invoice.  If we receive payment in full on or before the due
date we will allow a discount of 5% except where we have quoted a special
net price.  If payment is not received in full on or before the due date we
shall be entitled in addition to the invoice price to:
(i)  payment of a sum equal to any increase in the copper price supplement
applicable to the particular goods sold between the date of receipt of order
and the date of receipt of payment in full; and
(ii)  interest on any part of the invoice price unpaid after the due date at
the rate of 3% per annum over the base rate for the time being of Midland
Bank plc.

5.  TIME
We give estimates of delivery dates in good faith and time of delivery is
not nor shall be made of the essence of any contract nor shall we be liable
for any loss or damage occasioned by delay in delivery.

6.  DELIVERY
We deliver free normally by our own vehicles within 25 miles of any of our
manufacturing depots.  Delivery to any place more than 25 miles from one
of our manufacturing depots is subject to our quoted delivery charges.  We
reserve the right to make delivery of goods contained in one order by more
than one consignment and at different times.  Where a period is agreed for
delivery and such period is not extended by our Agreement, the Purchaser
shall take delivery within that period.    If the Purchaser fails to take delivery,
we shall be entitled at the Purchaser's risk and expense to store the goods
at the Purchaser's premises or elsewhere and to demand payment as if they
had been despatched.  Offloading at point of delivery shall be the
responsibility of and be undertaken by the Purchaser.

7.  SHORTAGES OR DAMAGE
Goods must be inspected before signature of delivery note and any damage,
shortage or discrepancy noted on the delivery note and the goods returned
on the same vehicle.  The buyer must also give us immediate written notice
of the damage, shortage or discrepancy so that we may prompt investigation.

8. RETURN OF GOODS
Goods may not be returned to the Company except by prior written
permission of an authorised officer of the Company and such return shall
be subject to payment by the Purchaser of handling and re-stocking charges,
transport and all other costs incurred by the Company.

 9. COMPANY LIABILITY
All our goods are made of the best materials from reputable  manufacturers
and where stated are manufactured to the appropriate British Standard.
Complaints must be given to us immediately, before any action is taken,
as responsibility cannot be accepted if repairs or renewals are attempted

        

Gledhill

 (Water Storage) 

Ltd

Summary of Contents for PULSACOIL III

Page 1: ...DESIGN INSTALLATION AND SERVICING INSTRUCTIONS TEL 0800 14 55 55 7 www gledhill pulsacoil 3 co uk A mains pressure hot water supply system incorporating an off peak electric thermal store PULSACOIL III ...

Page 2: ...t be capable of providing for those services which could be required to be supplied simultaneously and this maximum demand should be calculated using procedures defined in BS 6700 PulsaCoil will operate at mains pressures as low as 1 bar and this must be available when the local demand is at its maximum but the preferred range is between 2 and 3 bar As a general guideline although a 15mm external ...

Page 3: ...e Table 1 1 The domestic hot water outlet temperature is regulated to 55o C by the elec tronic control system and is not user adjustable Use in Hard Water Areas There are two options for the pump speed control Option H must be used in hard water areas above 200ppm Option S can be used in soft water areas below 200ppm A patented control system within the Option H microprocessor offers a more sophis...

Page 4: ...e System status display OPTIONAL EQUIPMENT a The appliance is supplied with the components on the right hand side as shown in Figure 1 2 as standard but can be supplied left handed b A 22mm diameter warning pipe overflow connection Any options must be clearly specified at the time of order or a standard model will be supplied 4 Plate heat exchanger On peak I H Overheat thermostat Off peak I H Plat...

Page 5: ...50 Nominal store capacity litres 160 205 230 250 Weight kg Empty 39 41 46 52 Full 199 246 276 302 Hot water flow rate litres min 35 35 35 35 Typical dwelling types Bedrooms 1 2 2 3 2 3 2 4 Bathrooms 1 or 1 1 2 En suite shower rooms 1 1 2 1 NOTES 1 The PC245 model can be installed in a property with greater hot water demand However this will require more ON peak electricity to recharge the store 2 ...

Page 6: ...asins and sinks should be in 10mm and to the shower in 15mm d The final branches to taps in existing properties which are in 15mm should be restricted to balance the flow to each outlet e Best results for a balanced system are achieved by fitting appropriate flow regulators to each hot and cold outlet see Appendix 1 f For properties where the inlet pressure is high and the flow rates may exceed 30...

Page 7: ...any allows a limited day time off peak boost It is normal to supply the PulsaCoil III using an Ecomony 7 controller as shown in Figure 2 2 Alternatively the PulsaCoil III can be supplied from separate circuits as shown in Figure 2 3 In this case the two switches should be clearly labelled for the householders use Fig 2 1 Schematic layout of typical domestic hot cold water systems In addition to th...

Page 8: ...le pole switch with flex outlet and neon To lower off peak element Economy 7 controller Storage heaters 3A spur Pulsacoil feed spur To upper boost element Boost Switch To lower off peak element In addition to the supplies to the immersion heaters PulsaCoil III requires a 3 amp supply for the control circuit This 3 amp supply must be provided via a fused 3 amp double pole isolator providing 3mm of ...

Page 9: ...pansion cistern This allows adequate room for expansion PUMP SETTINGS REPLACEMENT Overflow Warning Pipe if fitted a The overflow warning pipe should be fitted to discharge clear of the building and be sited so that any overflow can be easily observed b The overflow warning pipe should be installed in a material suitable for use with heating feed and expansion cisterns in accordance with BS5449 suc...

Page 10: ...it terminal block as follows Live to terminal 1 Neutral to terminal 2 Earthtoterminal3 3 From the Ecomony 7 controller or separate 20A fuse and switch connections wire the mains power supply to the immersion heater terminal block as follows Unrestricted on peak live to terminal 5 L1 Unrestricted neutral to terminal 6 Unrestricted earth to terminal 7 Off peak live to terminal 8 L2 Off peak neutral ...

Page 11: ...f this is the case the immersion heaters should be allowed to bring the contents up to temperature Check that the thermostats do switch off at the correct temperature of 770 C If not the seal can be broken and the setting adjusted without affecting the warranty If the thermostats do not switch off the immersion heaters at the correct temperature the overheat thermostat will operate the overheat ma...

Page 12: ... from boiling in the event of immersion heater thermostat failure Green light No 2 will remain ON to indicate that the system is functioning correctly If Green light No 2 is OFF check the manual reset button on the overheat thermostat If the overheat button has popped out check and replace as necessary the immersion heater thermostats The thermostats must be set at 770 C Manually press the reset b...

Page 13: ...e in the following way to show fault conditions 13 Off No mains power supply check fuse Flashing Low frequency System status is OK Flashing High frequency Temperature measurement error faulty sensor or wiring On Permanent Processor related fault no control of hot water replace PCB MAINTENANCE No annual regular maintenance is required However with the manual fill model we do recommend that the wate...

Page 14: ...PARTS LIST 14 1 14 2 3 4 6 8 10 7 8AWG BS6231 1 0mm E59428 13 Brawa Mixing valve ...

Page 15: ...p 6 Store overheat thermostat 7 Gravity check valve 8 Immersion heater 9 Rod thermostat 10 Float switch 11 Relay 12 Green light neon 13 Brawa mixing valve 14 DHW Flow switch GT017 GT149 GT153 GT152 GT105 GT064 GT041 XB078 XB501 XB251 XB321 XB100 XC007 GT106 E05 664 E26 022 E26 024 E26 023 E05 723 397 978 E05 681 E39 184 E39 185 E39 186 E39 187 E39 190 385 872 E05 674 ...

Page 16: ...e regulators as in Option 4 for Taps Mixers WATER SAVINGS OPTIONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK RANGE Combined Regulators Aerator for screwing onto Taps Mixers with internal or external threads on their noses Anti Vandal models also available 2 MR05 T RANGE Internal Regulators Push fit into Tap or Mixer seats Produced in three sizes 12 5mm BS1010 12mm 10mm Flangeless models als...

Page 17: ... the purchaser over and above any liability to replace under 1 4 above whether in contract or in tort including negligence in respect of any one cause of loss or damage claimed to result from any breach of our obligations hereunder shall be limited to actual money damages which shall not exceed 20 000 provided that such monetary limit shall not apply to any liability on the part of ourselves refer...

Page 18: ... Conditions shall confer on the purchaser any rights or remedies to which the purchaser would not otherwise be legally entitled 6 Notwithstanding any other provision contained herein the Purchaser s hereby agree to fully indemnify us against any damages losses costs claims or expenses incurred by us in respect of any claim brought against us by any third party for a any loss injury or damage wholl...

Page 19: ...asion it is felt necessary to provide a secondary circulation We would recommend the use of Raychem HWAT Plus or similar self regulating trace heating to maintain the temperature in the hot water distribution system The system must be installed and commissioned fully in accordance with the manufacturers instructions ...

Page 20: ...TEL 0800 14 55 55 7 www gledhill pulsacoil 3 co uk Sales Service Repair Gledhill PulsaCoil 3 C O Hot Water Cylinders Limited 302 Foxhunter Drive Milton Keynes MK14 6GD ...

Reviews: