ADJUSTMENT AND GROUND FIXING:
KIT CONTENTS:
ITEM A M10 x 120mm Ground Fixing Bolt
x5 (2 Sided)
x6 (3 or 4 Sided)
ITEM B Support Leg
x2
Step 1: Adjustment of Spigot Legs When Sited on Uneven Ground
(If not required move on to Step 2)
7
Using a 13mm spanner/socket
unscrew the two bolts with
washers on the inside at the
bottom of the extrusions and
remove.
Lift the extrusion upwards and
pull the spigot leg down to a
more appropriate height ensuring
that the screen is now level.
Replace the bolts and washers
into the new holes within the
spigot leg and tighten with
spanner/socket. Repeat Figs 7 -
9 on the other legs that need
adjusting.
8
9
Step 2: Ground Fixing (Concrete In)
10
11
12
Using a 10mm masonry drill bit,
drill through the hole in the spigot
leg down into the concrete
approximately 150mm deep.
Tighten bolt using 17mm
spanner. Repeat Figs 10 - 12 to
ground fix the other extrusions.
P. 2
TOOLS REQUIRED:
13mm Spanner
x1
17mm Spanner
x2
Hand Drill with Pozi Drill Bit x1
10mm x 150mm Masonry Drill Bit x1
Hammer
x1
6mm Allen Key
x1
The fixing bolts (A) MUST appear as
above with the nut and washer at
the top of the bolt. Using a hammer,
tap fixing bolt through the hole in
the spigot leg until it is flush with the
spigot plate.
We recommend that a risk assessment is undertaken to identify an appropriate location for your waste
collection and recycling units. In order to reduce risk, some organisations decide to place the units a
minimum of 5 metres
away from buildings. Any potential risk can be further reduced by maintaining a
regime of regularly emptying the unit.