Installation Instruction
- 2 -
2. Tap & Hole Measure needed to install COM and Flange Handle
①
Prepare 4 spots of Tap 1/4-20UNC to adhere COM.
②
Prepare 4 Holes Ø0.3 inch(Ø7.5 mm) to adhere GCB800 or GCB1200.
③
Prepare to adhere the Flange Handle Assembly.
④
Prepare 2 spots of Bolt Stud 1/4-20UNC to adhere Lock to Door.
⑤
Installation spot may change depending on Cable Extension. Cable Extension: 60/84/128 inch(1524.0/2133.6/3251.2 mm)
⑥
Enclosure Depth “D” has to be at least 10.5 inch(266.7 mm).
※
Maximum Measure of “E”to Install COM
[Unit: inch (mm)]
Installation
Enclosure Depth
Spot Measure
10.5
18.9
“E” max
(266.7)
(480.1)
60
25
21
(1524.0)
(635.0)
(533.4)
Cable
84
35
30
Lengths (2133.6)
(889.0)
(762.0)
128
54
45
(3251.2)
(1371.6)
(1143.0)
4-Ø
0.3
[Ø
7.5]
E
9.06
[230]
8.35
[212]
7.83
[199]
3.82
[97]
4.69
[119]
0.75
[19.1]
13.62
[346]
4-(1/4-20UNC)
2-(1/4-20UNC)
STUD BOLT
2-Ø 0.26
[2-Ø 6.6]
MAX 2.52
[64]
R0.2
[R5]
1.24
[31.4]
MIN 13.2
[335.0]
3.96
[100.5]
MAX<0.79>
[20]
MIN<1.18>
[30]
MAX<2.01>
[51]
MAX<1.89>
[45]
MIN<10.5>
[266.7]
"D"