1-1/2 in.- 2 in.
(38mm - 51mm)
*VUULJ[PUN[OLWPWLZ
Connect water supply pipes to the valve body.
For shower only installation, install the plug (J) onto
the bottom unused port.
Apply threaded pipe tape to where threading
connection will be made.
J
M
M
0UZ[HSSPUN[OL[\IZWV\[
0UZ[HSSPUN[OLZOV^LY
Thread the shower pipe arm (B) through the
shower arm flange (C), and screw the shower
pipe arm (B) onto the vertical shower pipe elbow.
Screw the shower head (A) on to the shower arm (B).
Wrap the threads on the shower arm (B) with
sealant tape (M).
Apply sealant tape (M) on all threads.
Install a stub-out pipe (not included) for
the spout by using an adjustable wrench to
tighten.
Slip the tub spout (G) onto the stub-out pipe
pointing up and use an allen wrench (L) to
slightly tighten the set screw.
The proper length of stub-out pipe will extend
1-1/2 in. to 2 in. beyond the finished wall.
Rotate the tub spout (G) to final position and
use an allen wrench (L) to fully tighten the set
screw and secure the spout to the stub-out
pipe.
Installation (continued)
C
B
A
G
G
M
L
L
HOMEDEPOT.COM/GLACIERBAY
7