Before assembling the crane components, check whether the existing GKU type corresponds to the specifications on the technical
data sheet and whether it is suitable for the crane system to be assembled.
The first step is to fit the end carriages onto the single or double crane bridge. The corresponding drill holes and screw fittings must be made
by the crane builder in accordance with the specifications on the technical data sheet. For the GKU 5000 series, a lining plate must also be
installed for the single crane girder.
2.2 Assembly
The safety directions for handling loads should be followed (see Chapter 0.3) when transporting and assembling the crane components. Crane
components must be assembled by qualified staff, always bearing in mind the accident prevention directions in Chapter 0.2. Before assembly,
the crane components must be stored in an closed room or covered area. Should the crane components be destined for operation outdoors,
then it is recommended that a protective cover is erected to shield it from the effects of the weather.
Wherever possible, the crane components should be transported in their original packaging. The goods delivered should be checked for
completeness and the packaging disposed in an environmentally sound manner. It is advisable to have the crane components assembled on-
site by trained skilled personnel.
2.1 Transport and assembly
Mechanical adjustments may be performed by authorised specialists. If no tightening torques are specified for screw connections,
the general information in Chapter 3.2.3 applies.
Operating staff must carefully read the instruction manual of the crane components before initial start-up and carry out all the
checks. The crane components shall be put back into operation only after operational safety has been established. Unauthorised
persons must not fit the crane components or carry out work with them.
The operator must create an inspection pass during the start-up of the crane components. The inspection pass contains all the
technical data and the date of start-up. It provides a record of all servicing and maintenance work.
2 Start-up