Location
32
Code no. 550038
Rev. no. 16/1018
3.5. Positioning and levelling the ironer
Remove the bolts securing the ironer to the base of
the crate.
Spread the machine from the crate and in its place
insert the adjustment bolts as in the figure.
Level the machine properly as prescribed in Figure
3.4. Once the machine is level, lock the position of
the levelling bolts using the nuts.
Fig. 3.4
3.6. Removal of shipping braces
CAUTION!
REMOVE THE SECURING DEVICES AS INDICATED IN THIS SECTION.
ADVISABLE TO KEEP THE FIXINGS IN CASE THEY ARE NEED FOR SUBSEQUENT USE.
Remove the transportation fixings from the hand
guard
(Fig. 3.5)
Remove the bolt
A
and extract the yellow coloured
part
B
.
Check the correct functioning of the hand guard
switches.
Fig. 3.5