1
2
3
4
5
5
6
7
9
8
7A
1206 0894 GS
17003T
17005T
Key
Part
17002T
1 HP
17895T
1-1/2 HP
No.
Description
Qty.
1 HP
3 PHASE
1-1/2 HP
3 PHASE
1
Motor
1
AE100EH2
AP100FL-T
AP100GL2
AP100GL-T
2
3/8-16x1-1/4 Hex Cap Screw
4
U30-982ZP
U30-982ZP
U30-982ZP
U30-982ZP
3
Slinger
1
17351-0009
17351-0009
17351-0009
17351-0009
4
Pump Body
1
C2-85
C2-85
C2-85A
C2-85A
5
O-Ring
2
U9-430
U9-430
U9-430
U9-430
6
Shaft Seal
1
U109-118
U109-118
U109-118
U109-118
7
Stack*
1
P325-788R
P325-788R
P325-789R
P325-789R
7A
Nylatron Bearing
1
W31112R
W31112R
W31112R
W31112R
8
Pump Shell
1
P56-469SSL
P56-469SSL
P56-434SSL
P56-434SSL
9
Discharge
1
C152-3
C152-3
C152-3A
C152-3A
Repair Parts List
* Includes Key Nos. 5 and 7A.
4
C. Lubricate outside rubber surface of seat with soapy
water. Place cardboard washer over polished face of
seat and press into seal cavity using a 3/4” socket or
a piece of 3/4” standard pipe.
D. Be sure polished surface of seat is free of dirt and has
not been damaged by insertion. Re-move excess
soapy water. Dispose of card-board washer.
11. Installation of rotating half and spring:
A. Reinstall pump body on motor using extreme caution
not to hit ceramic portion of seal on motor shaft.
Reattach pump body to motor using capscrews.
B. Inspect shaft to make sure that it is clean.
C. Clean face of rotating half of seal with a clean cloth.
D. Lubricate inside diameter of rotating half with soapy
water and slide onto motor shaft (sealing face first).
E. Place spring over motor shaft so it rests on rotating
half.
12. To complete reassembly from this point, reverse
instructions 1 through 5 under “Impeller Stack
Changeout.”
NOTICE:
Lubricate suction and discharge O-Rings with
soapy water for easier installation of shell.