1/2" Flat Washer
Leveling Foot
1/2"-13 Hex Nut
Adjust leveling feet to ensure the deck heights are even.
1/2"-13 Hex Nut
1/2" Flat Washer
Use the Velcro strap to connect
runway sections together
configuration for the pole vault pit being used.
SETTING UP A POLE VAULT RAISED RUNWAY
vault standards. Use the normal procedure for locating the standards. The
the space allotted. See page 2 and the pole vault pit spec sheets for sizes.
1. Start by deciding where to locate the runway. Measure out and mark it off to ensure that the runway and pole vault pit will fit in
standards should be screwed down to the Basic Runway Sections they are on.
connect the sections.
leveling feet to adjust the deck height to remove any small differences where the runway sections meet. Use the Velcro straps to
2. Start laying out the runway sections, starting with the Vault Box Runway Section. Install the leveling feet as you go. Use the
3. Next, position the two Basic Runway Sections that will support the pole
4. Lay out the PV Pit Riser Pads. See the spec sheet for the recommended
5. Set up the pole vault pit on top of the PV Pit Riser Pads.
RAISED RUNWAY SYSTEM
www.gillathletics.com
9/12/2013
800-637-3090
Page 4 of 5
All rights reserved.
INSTRR100
Copyright
2013 by Gill Athletics.
INSTRUCTION MANUAL
55
1
2
"