RAISED RUNWAY SYSTEM

www.gillathletics.com

INSTRR100

9/12/2013

800-637-3090

All rights reserved.

Page 2 of 5

Copyright 

2013 by Gill Athletics.  

INSTRUCTION MANUAL

37.62m / 2.46m = 15.29

HOW TO ORDER A POLE VAULT RUNWAY

15.29 rounds up to 16

40m - 2.38m = 37.62m

____ x RR100 - Basic Runway Section

1

____ x RR500 - PV Pit Riser Pad

____ x RR200 - Vault Box Runway Section

5. Add 2 (to support the PV Standards)

16 + 2 = 18 total basic runway sections

Sections needed, use the following formula.

1. Determine the desired runway length in meters

2. Subtract 2.38

3. Divide by 2.46

4. Round up

653.......................10

65411...................10

65611...................12

66311...................12

66511...................14

66711...................16

To determine the number of PV Pit Riser Pads needed, 

consult the RR500 spec sheet for more details.

PV Pit Model        Recommended Pit Riser Qty

To determine the number of  Basic Runway 

Example:

The NCAA recommends a minimum runway length of 40 meters.

Minimum Runway Length

NCAA..........40 meters

NFHS..........40 meters

 8'-1" 

 137'-2" 

 41.80 m 

 7'-10" 

 2.38 m 

 2.46 m 