
Page
25
of
56
USE AND MAINTENANCE MANUAL
Code MUT 088
Rev. 1
The installation usually
is not performed directly by staff from
Gibus S.p.A.
but by staff appointed
by the buyer or customer.
The client (user) is responsible under the law to entrust the installation to an expert staff, strictly
complying to the installation rules listed in this manual. In particular follow the "Instructions for
proper installation" in Chapter 7.
At the time of installation arrange all the tools mentioned on the first pages of the “Installation
Instructions - MEDISOLAFLY R line”.
If installers are more than one, it is necessary to appoint an operations co-ordinator.
CHAPTER 6: SAFE INSTALLATION
IMPORTANT: The installation must be performed in full compliance with the
installation instructions and safety rules in force in mobile sites. Be especially
careful when working at height.
MECHANICAL STRUCTURE
6.1
IMPORTANT: Before using the staging, scaffoldings, ladders, any lifting elements
and all personal protective device, especially when working at height (harnesses,
safety belts, etc..), make sure all comply with the requirements of the current law
on safety and are all in good conditions.
WARNING: If the awning is to be mounted on a higher surface than the ground,
it is necessary to define and supervise the area during the ascent to the awning,
so that no one stands at any time under the suspended load. Securely fasten the
packages of the awning in order to prevent it from falling.
WARNING: Operators must act in accordance with the safety instructions received.
USE SUITABLE SLING DEvICES AND PROvIDED PPE.
WARNING: Improper installation can result in bodily injury. Read and carefully
follow the installation instructions (provided with this manual) to properly secure
the structure and the fabric cover, so avoiding any risk of falls. At the time of
installation arrange all the tools mentioned on the first pages of the “Installation
Instructions - MEDISOLAFLY R line”.
ATTENTION!: the “ceiling supports” the dowels are not sheared but extracted
(the worst case condition). In this case therefore, dowels must be used able to
withstand a double load with respect to the wall supports.
ATTENTION!: The choice of dowels depends on the type and condition of the wall
(wall or ceiling) and floor. If the necessary requirements are satisfied, use alternative
technical solutions like internal counter brackets in the wall, chemical dowels or
other solutions.
www.gibus.com
Summary of Contents for MED OPEN FLY
Page 2: ......