
3
unit assembly & set-up (cont.)
HOSE SUPPORT BOOM ASSEMBLY (cont.)
•
Lift assembly and install into boom pivot
brackets on discharge stack, first slipping top
portion of vertical boom member into top
bracket on stack, then dropping bottom
portion into bottom bracket.
1
2
•
Catch S-hook on one end of boom support
chain (5:9) into chain eye at end of horizontal
boom member.
•
Slip other end of chain through eye clip atop
hose support band, then adjust chain length
between hose and boom to about three feet
(3/4 of total length) by slipping S-hook on
end of chain through appropriate mid-link.
Manual No. 3100022
Not
for
Reproduction