Front extension arms required
6 x 200 cm / 6' 6”
Rear extension arm required
1 x 192 cm / 6' 3”
Lift range
1954 cm / 64’ 1”
Maximum Euro-adapter height
1217 cm / 39' 11”
Lift capacity (working load) accessories
85 kg / 187 lbs
Counterweight required for max. load
974 kg / 2142 lbs
Counterweight required to balance empty arm
518 kg / 1139 lbs
Crane weight (excluding dolly and weights)
846 kg / 1865 lbs
Dolly weight (unit weights see page 46)
244 kg / 536 lbs
Arm reach (pivot to camera head mount)
1286 cm / 42’ 2”
Length of rear end (pivot to outside of bucket)
278 cm / 9’ 1”
Continue from § 12, page 6
13.
Connect the 200cm / 6’ 6” extension number 2 to extension number 1. Slip the
connection flanges into each other and secure with the provided safety pin.
Note
: Section 2 must be supported by a suitable support stand or rostrum.
Tip
:
To avoid the sections jamming or getting stuck make sure that the sections
are joined parallel. Using a small amount of lubricant also helps. We suggest
rubbing the joints with an oiled rag prior to assembly.
14.
Connect the 200cm / 6’ 6” extension number 3 to extension number 2. Slip the
connection flanges into each other and secure with the provided safety pin.
Note
: Move the support stand or rostrum to support section number 3.
The “Rigging Harness Assembly” is described on page 9. After reading and
following the instructions, please proceed as follows.
15. Connect 2 turnbuckles to the bottom connection on the front side of the rigging
harness. Ensure that the locking pins are inserted fully.
16. Connect 2 standard rigging rods to the turnbuckles on the front side of the rigging
harness. Ensure that the locking pins are inserted fully.
17. Connect 2 standard rigging rods to the first 2 rigging rods. Ensure that the locking
pins are inserted fully.
18. Connect 2 Rigging Support Brackets to the Rigging Rod Connections on section 2.
Ensure that the locking pins are inserted fully.
19. Connect a Rigging Rod Connector to each of the second Rigging Rods ensuring that
the locking pins are inserted fully. Fit the Rigging Rod Connectors into the Rigging
Support Brackets as shown on page 10.
20. Connect 2 standard rigging rods to the Rigging Rod Connectors and in turn to the to
the rigging connectors on section 3. Ensure that the locking pins are inserted fully.
21. Hand tighten the rods by turning the turnbuckles until the rods are taut, then secure
the turnbuckles with the locking nut as seen on page 9.
Attention:
The rigging system when taut as well as the crane arm, should run in a
straight line and should not bend or dip.
22. When the Rigging Rods are taut and running in a straight line, insert the locking pin
connecting the Rigging Rod Connectors into the Rigging Support Brackets on section
2 as shown on page 10.