
GF-16 Crane System Instruction Manual
Page: 14
21. Connect 2 standard rigging rods to the turnbuckles on the front side of the rigging
harness. Ensure that the locking pins are inserted fully.
22. Connect another 2 standard rigging rods to the first 2 standard rigging rods. Ensure
that the locking pins are inserted fully.
23. Connect 2 rigging rods in turn to the connectors on extension number 2. Ensure that
the locking pins are inserted fully.
24. Hand tighten the rods by turning the turnbuckles until the rods are taut, then secure
the turnbuckles with the locking nut as seen on page 9.
Attention:
The rigging system when taut as well as the crane arm, should run in a
straight line and should not bend or dip.
25. Connect the platform to the angle adjuster and secure with the removed safety pin
from the side of the angle adjuster. Ensure that the platform is level.
Tip
:
The angle adjuster has an integrated leveller. By turning it, the vertical plate
on the angle adjuster can be set to a perfect right angle. Correct setting of
the angle adjuster enhances the crane’s balance.
26. Remove the support stand or rostrum supporting the counterweight bucket section.
27. Then unlock the tilt friction.
Before operation, all locking pins, locking screws etc should be inspected to ensure
that all assembly sections are securely fastened.
Read “Balancing the crane arm” on page 44.