Insert cable glands
The WSD door-module is set up for connecting
two slack-rope switches and one pass-door
switch.
If you want to install a pass-door or slack-
rope switch, replace the side covers with
M16 x 1.5 cable glands.
M16 x 1,5
i
NOTE
Please note that only switches with performance level c (PLc) comply with the current
DIN EN 12453 standard.
Connection diagram System 1: OSE
ST3
ST1
2
1
X2
X1
2
1
2
1
➊ Slack-rope switch ➋ Pass-door switch
i
NOTE
Clamping range of the plug-in terminal for slack-rope and pass-door switches: 0.5 - 1.5mm².
Stripping length of the single conductors: 6.5 - 7mm, provided with wire end ferrules.