Operating instructions GF 500
9 Maintenance
29
9
Maintenance
The GF 500 should be checked and cleaned periodically.
Normal care of the GF 500 is limited to periodic cleaning of the outside.
9.1
Replacement of worn parts
•
PTFE coating of the heating element:
Clots, cracks or other damage:
–
heating element needs to be recoated
–
send the heating element to the nearest service center or to the
manufacturer (see the back of this manual).
Danger of injury!
Sharp planer blades!
Danger of cutting if the planer blades, which are sharp on both sides,
are touched.
•
The planer blades on the planer should be replaced periodically.
For order number see spare parts list.
9.2
Hydraulic system
•
The hydraulic connections on the machine and on the hydraulic unit
need regular cleaning.
•
When not in use, the hydraulic connections on the GF 500 and on
the hydraulic unit should be protected with the protective caps.
Caution