60
E
Commissioning
Slowly open the shut- off valve up-
stream of the pressure-reducing valve.
With the JRGURED UP cartridge installed, the
JRGURED UP pressure reducer is ready for
operation.
Section
Page
1. Installing and removing the
locking sleeve
61
2. Installing and removing the
by-pass plug
64
3. Performing a pressure test in
the risers
65
4. Installing and removing the
JRGURED UP cartridge
66
5. Installing and removing
the shut-off unit
68
6. Re-setting the pressure
69
7. Actuating the shut-off unit
70
8. Cleaning the filter
71