TS 5000 ISM BG
GB 7
Initial operation
X
Pull out driver as far as possible (
1.
).
X
Loosen screws of stop rod (max. ½ rotation) (
2.
).
Stop rod may not pass under driver..
X
Pull out stop rod (
3.
).
à
Distance between edge block and stop is approx. 30 mm
X
Close moving leaf (
4.
).
Stop rod for function safeguard of the integrated closing sequence control is in position.
X
Open moving leaf (
5.
).
X
Tighten screws of stop rod (
6.
).
6.8 Mounting cover panel
B
D
C
(5)
(5)
35
35
GF
SF
A
C
C
= B - 1189 mm
= D - 10 mm
2.
1.
2.
3.
4.
4.
Fig. 6.8.1
X
Remove break-off section on fixed leaf for trigger lever (
1.
).
X
Clip on moving-leaf cover panel and fixed-leaf cover panel (
2.
).
X
Shorten adjustable-size middle cover panel “A” to size “C” (
Fig. 6.8.1
).
X
Clip on middle cover panel (
3.
).
X
Insert inspection caps between cover panels (
4.
).
7
Initial operation
Functional test of closing sequence control
X
Open moving leaf.
X
Open fixed leaf and hold it open.
X
Moving leaf remains in waiting position of closing sequence control and also closes when fixed leaf is closed.
8
Maintenance, servicing, repairs
The installing company must alert the operator of the system to this part of the mounting instructions and hand
it over to the operator together with the user information (see ‘GEZE user information for door closer’).
Regular servicing must be carried out (see ‘GEZE user information for door closer’). It is to be carried out by a
qualified specialist company.
Any repairs are to be carried out by GEZE or qualified personnel authorised by GEZE.