TS 4000 R
GB 9
Initial operation
7
Initial operation
CAUTION!
To avoid unnecessary contamination the installation of the smoke switch should be undertaken only just
before the initial operation.
In case of early installation there is a risk that the smoke switch is contaminated by construction dust. This
shortens the life of the smoke switch considerably!
7.1 Remove cover
X
Remove protective cap (
1.
).
X
Remove cover (
2.
).
Fig.: 7.1.1
7.2 Installation and connection of the smoke switch
X
Clip on smoke switch (
1
.).
Fig.: 7.2.1
2.
3.
3.
Fig.: 7.2.2
X
Plug in 24 V cable of the door closer (
2
.) and the power pack (
3
).
X
For additional connections, see the separate document “Instructions for Installation, Commissioning, Operation
and Maintenance of the GEZE Hold-Open Device FA GC“.