Installation
3.2.4 Layout of the modules on the top-hat rail
It is imperative that the module layout on the top-hat rail is observed.
X
Place the modules on the top-hat rail in the following order directly next to each other (from left to right):
à
Power module extensions
PME
(if present)
à
Power module
PM
à
Control module
CM
and associated drive modules
DM
(if present)
à
For each further fire section one sensor module
SM
and respective associated drive modules
DM
(if present)
à
Weather module
WM
(if present)
MBZ300
PM
230V
24V
230V
Reset
MBZ300
CM
Reset
MBZ300
CM
Reset
MBZ300
CM
DM
MBZ300
DM
MBZ300
DM
MBZ300
MBZ300
PM
230V
24V
230V
MBZ300
PM
230V
24V
230V
MBZ300
PME
230V
24V
230V
MBZ300
PME
230V
24V
230V
MBZ300
PME
230V
24V
230V
Reset
MBZ300
CM
Reset
MBZ300
SM
Reset
MBZ300
SM
WM
MBZ300
MBZ300
DM DM DM DM DM DM
ERM
ERM
Fire section 1
Fire section 2
Fire section x
3.2.5 Changing the module configuration
As long as the system has not yet been configured with the PC, the number, type and order of the modules are
recognised automatically after every restart and integrated into the standard configuration (self-teaching function).
If the assignment of the drive modules to the fire sections has to be changed subsequently (for example because
an additional SM module has been installed), the system has to be reconfigured.
X
Press the RESET push button on the CM module for approx. 20 s until all the operating LEDs flash.
The modules are now readdressed automatically.
X
Only connect or disconnect modules in de-energised state, switch mains voltage and battery off first.