
MBZ300
11
Installation
3.2.2 Space required for the modules and components on the top-hat rail (width)
Module
à
Control module
CM
, sensor module
SM
, relay module
ERM
,
drive module
DM
, weather module
WM
à
approx. 23 mm
à
Power module
PM
, power module extension
PME, DME
à
approx. 46 mm
Examples
à
PM
,
CM
and
DM
(minimum equipment):
46 + 23 + 23 = 92 mm
– or –
with
WM
:
92 + 23 = 115 mm
~
~
MBZ300
MBZ300
, DME
ERM
~101 mm
Switching power supply units
PS 10A
~125 mm
~85 mm
~125 mm
~175 mm
PS 24A
If there is only one switching power supply unit with 10 A, its required space on the top-hat rail is added to that
of the modules. Otherwise the switching power supply units are located on a separate top-hat rail.
3.2.3 Dimensions of the batteries
Battery type Nominal voltage [V] Capacity [Ah]
Length [mm] Width [mm] Height [mm] Weight [kg]
Pole type
NP 7-12
12
7
151
65
97.5
2.2
4.8 mm
NP 12-12
12
12
151
98
97.5
4.09
6.3 mm
NP 17-12 I
12
17
181
76
167
5.97
M5
NP 24-12 I
12
24
166
175
125
8.92
M5
NP 38-12 I
12
38
197
165
170
13.93
M5
The dimensions apply for 1 battery. Two batteries are required per control panel.
Summary of Contents for MBZ300
Page 47: ...MBZ300 47...