15
2 Installation and maintenance
2.1
Safety instructions for installation and maintenance
Authorised personnel
•
Installation may only be performed by qualified electricians or GEZE-approved
specialists.
•
Repair and maintenance work, however, may only be performed by GEZE-
approved specialists.
Working with safety in mind
•
Before any maintenance or installation work is carried out on the RWA-
Emergency Power Control System, disconnect the power supply.
•
Comply with the regulations, standards and guidelines and, in particular, the latest
version of the VDE 0833/0815 guidelines.
•
Consult the local approval authorities to determine the type of cable (for example
fire protection cable) and the required type of protection.
•
Use only original GEZE parts for repair and retrofitting work.
•
When replacing the batteries, use only batteries recommended by GEZE.
Disclaimer
If any changes are made to the system by an unauthorised person, or if components
other than GEZE original parts or GEZE recommended batteries are used, GEZE
shall not be liable for any resultant damage.