background image

31

Drain requirement

Flow capacity

100 L/min, 26.4 US Gal/min

Position (floor, Wall)

either

Drain connection size

Ø40 mm (1 9/16”) (Inner Dimension)
Ø46 mm (1 13/16”) (Outer dimension)

The bath must be connected to a drain. Use an air gap bracket, if needed.

Connections must be done in accordance with local regulations.

Physical chemical demands

PH range

Ph 7.5 - Ph 9

Conductivity (min)

More than 50 µS/cm 

Chloride (max)

Less than 50 mg/L

Hardness

Less than 20° dH

Alkalinity

60-200 mg/l HCO

3

Electrical Data: EU and North America 

Voltage

230V (EU) 
120V (North America)

Frequency

50Hz (EU) 
60Hz (North America)

Power consumption (max)

800VA 

Number of phases

Single phase AC

Protective earth

Yes

Potential equalisation

Yes

Max Duty Cycle Lift / Hi-Lo

1 min ON, 9 min OFF

Max Duty Cycle Air Spa

15 min ON, 15 min OFF

Summary of Contents for Arjohuntleigh Parker

Page 1: ...Parker Assembly and Installation Instructions with people in mind 06 AL 00_12GB 02 2016...

Page 2: ...untleigh group of companies ArjoHuntleigh AB 2011 As our policy is one of continuous improvement we reserve the right to modify designs without prior notice The content of this publication may not be...

Page 3: ...allations 11 Water Installation 12 Guidance for correct installation of water hoses 12 Mounting of Parker bath 14 Final placement 14 Installation Overview 16 Electrical Installation 17 Drain Installat...

Page 4: ...4 Intentionally left blank...

Page 5: ...tions are intact and free from water leaks all hoses and pipes are free from movable parts of the unit all functions of the bath work normally Adjust if necessary other electrical devices e g hand con...

Page 6: ...W L Measurements box with contents L Length 2035 mm 80 1 8 H Height 1128 mm 44 3 8 W Width 948 mm 37 3 8 Weight box with contents approximately Depending on selected options 189 196 kg 417 432 lbs Wei...

Page 7: ...7 Max 2510 mm Max 98 7 8 750 mm 29 1 2 Reclined 1960 mm 77 1 8 1500 mm 59 730 mm 28 3 4 50 mm 2 These dimensions are approximate and unless otherwise stated should be treated as minimum requirements...

Page 8: ...ct to avoid having body parts jammed Also make sure there is 50 mm 2 between the fully opened Parker bath door and the ceiling If a ceiling lift will be used together with Parker bath make sure to ins...

Page 9: ...osition Peninsular position Space required when integrating with a lifting device 250 9 7 8 250 9 7 8 250 9 7 8 2460 96 7 8 1700 66 7 8 2700 106 1 4 250 9 7 8 800 31 1 2 800 31 1 2 3010 118 1 2 1700 6...

Page 10: ...product always make sure that ALL staples are fully removed when removing the outer cover This will prevent damage to the laminate surface 1 Parker bath tub 5 Cable ties 2 Hand control 6 Knob assembl...

Page 11: ...age hose 690 mm 5 Elbow 40 mm 1 9 16 90 2 Drainage hose 2100 mm 6 Pipe adapter with o ring 40 mm 1 9 16 38 mm 1 1 2 3 2 hose clamps 7 Air gap bracket assembly kit Option 4 3 pipe connectors 40 mm 1 9...

Page 12: ...xer NOTE For water supply requirement and water hoses requirements see section Site Requirements and Specifications CAUTION The water hoses must be installed within sight They must not be walled up in...

Page 13: ...13 Intentionally left blank...

Page 14: ...3 Let four people two on each side of the tub each grab a strap and lift Parker bath out from the pallet Move the tub to it s the intended place Figure 2 xx 4 Turn the nut on each foot to adjust the...

Page 15: ...15 1 3 4 5 6 Turn nut to adjust Parker bath s height Two tracks Incorrectly mounted Correctly mounted 2 The following steps are not applicable for baths with the optional base on the legs...

Page 16: ...16 Installation Overview Hot water from wall or floor Cold water from wall or floor Drain to connect to floor or wall Field wiring box Mains connection electrical and water Equipotential bonding point...

Page 17: ...ate fuse with ground fault interrupter in accordance with local codes and regulations The product must be protected by a ground fault circuit interrupter not supplied Check that the electrical supply...

Page 18: ...the nut 6 Attach the air gap bracket to the floor drain by either of the following methods lift the floor drain cover and fixate the bracket using the M5 screws M5 washers and M5 Nyloc nuts or mark t...

Page 19: ...for the drainage hose Drainage hole for the MultiClean cut A Pipe connector Elbow Pipe adapter with o ring Nut M5 screw Selftapping Self tapping screw Hose clamp 1 2 Water trap Hose clamp Drainage hos...

Page 20: ...hose clamp Attach the open end of the pipe adapter to the 38 1 1 2 mm wall drain Customized connection Figure 3 At certain situations the elbow can be used to make the installation more suitable 1 Con...

Page 21: ...21 1 2 3 Water trap Pipe connector Hose clamp Drainage hose Pipe connector use at 40 mm 1 9 16 wall connection Hose clamp Pipe adapter use at 38 mm 1 1 2 wall connection Elbow Max 100 mm 4 Water trap...

Page 22: ...ater inlets on the tub Figure 2 In house requirement Min flow supply pipe 25 l min 6 6 US gal min 50 l min CW HW 13 2 US gal min CW HW Water connection hoses requirement Flexible hoses Nominal size DN...

Page 23: ...23 HOT COLD Red Blue 1 2...

Page 24: ...he black stop ring Figure 4 10 Make sure the stop peg is positioned accord ing to the illustration The stop peg should be positioned right under the red tempera ture marking Figure 5 11 Take the knob...

Page 25: ...AVERTISSEMENT Ne pas utiliser avant calibration DE WARNUNG Vor der Kalibrierung nicht benutzen NL WAARSCHUWING Niet gebruiken v r kalibreren IT AVVERTENZA Non utilizzare prima della taratura ES ADVERT...

Page 26: ...3 5 Set the temperature as low as possible 6 Open the cover and grab the disinfection spray handle 7 Press the disinfection button for 5 seconds 8 Spray disinfection fluid in the bath while keeping a...

Page 27: ...2 3 4 MIX 80 70 60 50 40 30 20 Arjo Clean 30 Arjo General Purpose Disinfectant 35 Arjo Disinfectant Cleanser IV 60 Cen Kleen IV 30 Attach suction part to bottle cap Turn suction part for right mix ra...

Page 28: ...Tighten the grub screws These secure the block pieces to the shower pole Figure 5 8 Insert the assembled shower pole into the shower stand base Make sure the flat side of the mounting block locks in t...

Page 29: ...29 Long screws Washers 1 2 3 4 5 6 7 8 Remove base cover Assemble from bottom up Tighten the grub screws min 44 mm 1 3 4 Short screws...

Page 30: ...0 C 176 F HW flow of 58 L min 15 3 Gal min 3 bar 43 PSI Lower limit dynamic pressure at 8 C CW and at 80 C HW and 26 L min flow GB 0 8 bar 12 PSI Lower limit dynamic pressure at 8 C 46 F CW and 80 C 1...

Page 31: ...al regulations Physical chemical demands PH range Ph 7 5 Ph 9 Conductivity min More than 50 S cm Chloride max Less than 50 mg L Hardness Less than 20 dH Alkalinity 60 200 mg l HCO3 Electrical Data EU...

Page 32: ...32 Intentionally left blank...

Page 33: ...33 Intentionally left blank...

Page 34: ...34 Intentionally left blank...

Page 35: ...2 745 800 Fax 44 0 1582 745 866 E mail international arjohuntleigh com ITALIA ArjoHuntleigh S p A Via Giacomo Peroni 400 402 IT 00131 ROMA Tel 39 0 6 87426211 Fax 39 0 6 87426222 E mail Italy promo ar...

Page 36: ...des solutions for infection control within healthcare and contamination prevention within life sciences Maquet specializes in solutions therapies and products for surgical interventions interventional...

Reviews: