37
Attention!
The packing rings may get damaged.
Make sure you do not damage the
packing rings during installation and
removal.
When installing and removing the
packing rings never use force.Make
sure that the packing rings are
correctly positioned and not skewed.
Position a punch made from aluminium or
copper onto the base bushing (14).
Force the rings out of the stuffing-box packing:
Packing rings (12)
Grooved ring (18)
Check the stuffing-box chamber and all
dissembled parts for signs of damage.
Replace all worn or damaged parts.
Clean all dirty parts.
Detaching the stem from the spindle
The stem and spindle are connected by a
rivet pin. Only separate the stem and
spindle in order to replace damaged parts.
Use a punch to knock out the rivet.
Check all parts for signs of damage.
Replace all worn or damaged parts.
Dismantling the sleeve insert
The sleeve insert is pinned together with a
slotted straight pin. You only have to
disassemble the sleeve insert if you want
to replace sleeves.
Use a punch to knock the slotted straight pin out
of the sleeve insert.
Assembling the equipment
Work prior to re-installation
CAUTION
Sharp edges on component parts can
cause cuts.
Wear industrial gloves when servicing
equipment parts.
Clean all component parts before re-installing
them.
Attention!
The equipment may leak if seals are
damaged.
Always insert new packing rings and a
new body gasket when assembling
the equipment.
Inspect all seals and packing rings
before installation to ensure they are
in perfect condition.
Replace damaged seals and packing
rings.
Summary of Contents for ZK 29
Page 1: ...Control Valve ZK 29 Original Installation Instructions 810685 05 ...
Page 58: ...58 ...
Page 59: ...59 ...