27
PRS 50 - Installation & Operating Manual -
850652-00
What to do in the event of system malfunctions
In the event of malfunctions or errors that cannot be remedied with the aid of this Installation &
Operating Manual, please contact our service centre or authorised agent in your country.
Taking out of service
1.
Switch off the supply voltage and switch off the voltage to the equipment.
2.
Check that the equipment is not live.
3.
Pull off the upper and lower terminal strips, see
Fig. 3
A
;
B
4.
Release the slider holder on the base of the equipment and detach the PRS 50 blowdown timer from
the support rail.
Disposal
Dispose of the PRS 50 blowdown timer in accordance with statutory waste disposal regulations.
Returning decontaminated equipment
If products have come into contact with media that are hazardous to health, they must be
drained and decontaminated before being returned to GESTRA AG.
Such media include solid, liquid or gaseous substances, mixtures of these, or
radiation.
GESTRA AG can accept returned products only if accompanied by a completed and signed
return note and also a completed and signed declaration of decontamination.
The return confirmation and declaration of decontamination must be attached to the outside
of the return package, as processing will otherwise be impossible and the products will be
returned to the sender at their expense.
Please proceed as follows:
1.
Let GESTRA AG know about the return beforehand by e-mail or phone.
2.
Wait until you have received the return confirmation from GESTRA.
3.
Fill out the return confirmation (and declaration of decontamination) and send it with the
products to GESTRA AG.
Summary of Contents for PRS 50
Page 1: ...Original Installation Operating Manual E N English Blowdown Timer PRS 50 850652 00 ...
Page 29: ...29 PRS 50 Installation Operating Manual 850652 00 For your notes ...
Page 30: ...30 PRS 50 Installation Operating Manual 850652 00 For your notes ...
Page 31: ...31 PRS 50 Installation Operating Manual 850652 00 For your notes ...