
13
PRE-INSTALLATION INFORMATION - PRÉALABLES - PRELIMINARES
Beforetheinstallationtoscrewthesupplyflexibletubestothecontrolsandinstallthepop-upwasterod
on the body of the spout.
Avantdel’installationvisserlestubesflexibled’alimentationauxcommandeset
i
nstaller la tige de
contrôle de l’écoulement.
Antesdelainstalaciònatornillarlostubosflexiblesdealimentaciònalosmandosy
Instalen el asta de
controle de descarga.
Summary of Contents for MIMI 36511
Page 5: ...5 PRE INSTALLATION INFORMATION PRÉALABLES PRELIMINARES Art 36511 ...
Page 6: ...6 PRE INSTALLATION INFORMATION PRÉALABLES PRELIMINARES Art 36515 ...
Page 16: ...16 INSTALLATION INSTALLATION INSTALACIÓN Fig 5 Fig 6 Fig 7 Fig 9 Fig 8 1 7 16 37 mm ...
Page 31: ......
Page 32: ...ET 41389 R1 ...