© GES Electronic & Service GmbH www.ges-electronic.de
© GES Electronic & Service GmbH www.ges-electronic.de
79
Series
MC
S
Series
Assembly instructions (KB/KS)
Slide contacts (5) completely into insulation
part (6) until contacts snap
Insert all contacts at the same time. Pull gently
to check that contacts are correctly located
and remain in position.
Slide insulation part (6) into housing (7)
until insulation part snap in
Use notches for correct position of
insulation part.
Assembly finished
11.
13.
12.
14.
Put on cap
Wrench size
cap
Wrench size
housing
Tightening
torque [Nm]
20
19
5
!
...
1. Please carefully read assembly
instructions before cable assembly.
2. Cable assembly must only be done
by trained and qualified personnel.
Note – important!
!