background image

© GES Electronic & Service GmbH     www.ges-electronic.de 

© GES Electronic & Service GmbH     www.ges-electronic.de 

79

 Series

MC

S

 Series

Assembly instructions (KB/KS)

Slide contacts (5) completely into insulation 

part (6) until contacts snap

        Insert all contacts at the same time. Pull gently 

to check that contacts are correctly located 
and remain in position.

Slide insulation part (6) into housing (7) 

until insulation part snap in

       Use notches for correct position of 

insulation part.

Assembly finished

11.

13.

12.

14.

Put on cap

Wrench size

cap

Wrench size

housing

Tightening 

torque [Nm]

20

19

5

!

...

1.  Please carefully read assembly 

instructions before cable assembly.

2.  Cable assembly must only be done 

by trained and qualified personnel.

Note – important!

!

Reviews: