![Gerni NEPTUNE 2 Operating Instructions Manual Download Page 9](http://html1.mh-extra.com/html/gerni/neptune-2/neptune-2_operating-instructions-manual_2217245009.webp)
9
1)
Options / model variants
NEPTUNE 2
3.7 Electrical
connection
Before connecting devices with
voltage changeover
1)
: Check that
the pre-selected voltage on the
machine corresponds with the
voltage of the electrical instal-
lation. Otherwise the electrical
devices of the machine can be
destroyed.
CAUTION!
When using cable reels:
1. Due to the risk of overheat-
ing and fire, always unwind
the power supply cord fully.
The cleaner may only be con-
nected to a correctly installed
electrical installation.
1. Observe safety instructions in
chapter 1.
2. Put the plug into the electrical
socket.
400V
400V
230V
230V
2%
3%
4%
3.8
Antifreeze - before first
use
The machine is protected with
anti-freeze from the factory.
Catch the liquid discharging at
first (approx. 5 l) for re-use in a
container.