
CRX 9
6. Installation
12
II
I
10 a
Closed
flush-mounted
installation
9. Turn on the water supply and slowly open the shutoff valve (10 a) in the
cold-water connection (position I) if necessary.
Check all connections
for leaks.
10. Next, open and close the hot water tap several times until no more air
emerges from the line and all air has been eliminated from the heater.
Summary of Contents for crx9
Page 14: ...14 CRX9 1 1 7 2 3 4 5 6 1 2 3 4 STB 5 6 7...
Page 16: ...16 CRX9 4 43 30 GEFAHR 15 Power 2 Pressure 3 5 35 55 4 Power 2 Overheat 1 1 2 4 5 3...
Page 17: ...17 CRX9 1 2 1 3 4 GEFAHR...
Page 18: ...18 CRX9 4 GEFAHR II I 10a 10c 10b 10 1 II 10a 2 10b 10c 3 4 5 I 6 10 1 2 10 d 3 4 5 6 10d...
Page 19: ...19 CRX9 GEFAHR 5 German Pool LED Power Pressure...
Page 20: ...20 CRX9 6 1 2 12 mm 12 mm 3 P T F E 1 2 4 6 mm 5 3 8 6 10 a I 7 CRX 9 2...
Page 21: ...21 CRX9 6 1 2 1 2 1 2 1 2 3 1 2 4 10 d 5 3 8 3 8 6 6 mm 7 8 10 a 9 10d...
Page 22: ...22 CRX9 6 GEFAHR GEFAHR IP25 IEC 1 2 m 3 bar 6 bar...
Page 23: ...23 CRX9 6 1 2 3 6 mm 4 5 6 7 P T F E 8...
Page 24: ...24 CRX9 6 II I 10a 9 I 10 a 10...
Page 25: ...25 CRX9 6 GEFAHR I 1 3 mm 2 3 4 5 6 German Pool www germanpool com...
Page 26: ...26 CRX9 1 1 7 2 3 4 5 6 1 2 3 4 STB 5 6 7...
Page 28: ...28 CRX9 4 43 C 30 C GEFAHR 15 Power 2 Pressure 3 5 35 C 55 C 4 Power 2 Overheat 1 1 2 4 5 3...
Page 29: ...29 CRX9 1 2 1 3 4 GEFAHR...
Page 30: ...30 CRX9 4 GEFAHR 10 1 II 10a 2 10b 10c 3 4 5 I 6 10 1 2 10d 3 4 5 6 II I 10a 10c 10b 10d...
Page 31: ...31 CRX9 GEFAHR 5 German Pool LED Power Pressure...
Page 32: ...32 CRX9 6 1 2 12 mm 12mm 3 P T F E 1 2 4 6 mm 5 3 8 6 10a I 7 CRX9 2...
Page 33: ...33 CRX9 6 1 2 1 2 1 2 1 2 3 1 2 4 10d 5 3 8 3 8 6 6 mm 7 8 10a 9 10d...
Page 34: ...34 CRX9 6 GEFAHR GEFAHR IP25 IEC 1 2 m 3 bar 0 6 MPa 6 bar...
Page 35: ...35 CRX9 6 1 2 3 6mm 4 5 6 7 P T F E 8...
Page 36: ...36 CRX9 6 9 I 10a 10 II I 10a...
Page 37: ...37 CRX9 6 GEFAHR I 1 3mm 2 3 4 5 6 German Pool www germanpool com...