5

Thermometer

Setti ngup

heating

Operation
mode

switch

Pressure gauge

6

Res et

Central- heati ng an d ho t-wat er mode

Hot- wate r mode

Off

Service

function

Signal lig ht

On

Signal lig ht

Operatio n

Signal lig ht
Breakdo wn

O

Settings up
hot-water

temperature

The control centre for controlling boiler operation is a modulation electronic board

equipped with a microprocessor. Sensor state and value is scored by software which also
gives orders to active elements gas valve, ignition electronics, circulation pump. On the

inside distribution of heating water outlet there is an emergency thermostat, pressure switch

and pressure gauge signalling the pressure in the heating piping.

In the case the temperature of outgoing heating water overcomes 95°C, the emergency

thermostat puts the boiler in emergency condition following by putting it out of operation.
In the case the pressure in the heating system falls under 1 bar, the pressure switch puts the

boiler out of operation. In inside distribution of heating water inlet there is a 3-bar-safety

valve and a circulation pump. In the bridging of hot water inlet and heating water inlet

there is a ball valve serving for filling the heating system from the distribution net. In the
rear part of the boiler there is an 8-liter expansion tank connected with the pump. Outside
case is treated with dust paint with thermal endurance up to 180°C.

The thermometer and pressure gauge take the temperature and pressure in the heating

system. With a button for setting the heating temperature, a user can set the temperature of

water in the heating system in the range of 35 - 85°C. The recommended range is 55 -
85°C. With a control button for setting up hot-water temperature, a user can set requested

outlet temperature of hot water in the range of 35 - 60°C. Signal light

signals a

condition, when the electronics did not manage to burn the boiler (e.g. because of gas
delivery failure). Return to operation condition can be made by brief turning the operation

mode switch into the right extreme position (reset) when controlling the boiler operation.

The signal light

signals burning of the boiler. The signal light

serves to

signalling of starting the boiler mode. The operation mode switch has these positions:

– the boiler off
– summer operation (hot-water preparation on, heating off)

– winter operation (hot water and heating on)

– unblocking the boiler breakdown (reset)

Control front board of the boiler

Breakdown

Operation

On

– service testing function

The heating system must include a proper filter. To utilize the maximum output of the

boiler it is necessary to ensure minimum pressure in the heating system of 1 bar for right
functioning and long lifetime. A built in expansion tank enables connecting the boiler to

closed heating system.

The boiler is to operate on natural

gas of 20 mbar nominal pressure in the distribution net. The boiler is located so as to ensure

necessary operating conditions whether it is an appliance with open combustion chamber
(flue) or with closed combustion chamber (turbo) and with regard to the ways of
combustion air supply and waste gas exhaust.

The service of the boiler must be carried out by the rules described in this manual. Except
service works, the user must not carry out any repairs on the appliance nor adjustments or

dismounting and cleaning the inside parts of the boiler. The boiler can be operated only by

an adult.After leaving home in winter (on holiday...) a supervision by a trained person is

needed. If there is a danger of approach of inflammable (combustible) gases or fumes to the
boiler (e.g. when lying a PVC flooring), it must be put out of action early. The user is
obliged to take care of proper use of the boiler according to this instruction which is also a

condition to acknowledge guarantee. When putting the boiler to operation, the service

worker must instruct the user about boiler operating.

Fast-heating wall boilers ATTACK NST, NSK are equipped with copper heat-exchangers

protected on surface with silicone coating on the base of aluminium, resistent to 430°C.
These are exchangers with separated systems to warm up hot water and heating water. A

big adventage of this exchanger is place and weight saving. Maximum operation pressure
for heating circle is 300 kPa (3 bar) by 85°C, for hot-water circle 600kPa (6 bar) by 60°C.

Minimum operation pressure is 100 kPa (1 bar). The heat-exchanger is located in the upper

part of combustion chamber and is fitted with an automatic deareating valve, which leads

over closing chamber. For minimum loses during heat transmission it is necessary to keep

the surface of heat-exchanger lamellas clean.

The source of heat is a gas burner of modern unit-built design made from stainless steel. It
is located in the bottom part of combustion chamber. There are two electrodes in the burner.

One of them is a spark ingition electrode, another is a inonization probe for burning

control. Combustion chamber is made from aluminium-coated steel plate with inside

thermal insulation. Over the combustion chamber (NST) is a waste-gas collector with a fan
for waste-gas draw. With the help of silicone tubes is the fan connected to a switch of
differential pressure (manostat). In the flue version (NSK) there is a draw breaker with a

waste-gas thermostat. In the upper part of the exchanger there are thermal probes for

heating and hot-water system. The inside water piping in the boiler is made from copper

pipes. Closing chamber of the boiler (NST) is made from aluminium-coated steel plate.

Openings in the closing chamber are sealed with silicone seal. On hot water inlet there is a
water-passage sensor installed. Fast-heating wall boilers ATTACK NST and NSK are
equipped with automatics and continuous regulation of output.

On hot-water inlet to the boiler it is necessary to install a

magnetic or electromagnetic water treatment device.

The user with his or her signature

in the letter of guarantee confirms having been instructed with the boiler operating.

Conditions of service:

Technical description

Summary of Contents for Attack NSK

Page 1: ......

Page 2: ...ignitionandionization unit 25 Defectsofignition unit 26 The chart ofNST connecting 27 The chart ofNSK connecting pump characteristics 28 Setting minimum and maximum output 29 Notes 30 Record on putting the boilerinto operation and obligatory service inspections Putting the boiler into operation Before first putting into operation it is necessary to take following steps Procedure of the first boile...

Page 3: ...ignitionandionization unit 25 Defectsofignition unit 26 The chart ofNST connecting 27 The chart ofNSK connecting pump characteristics 28 Setting minimum and maximum output 29 Notes 30 Record on putting the boilerinto operation and obligatory service inspections Putting the boiler into operation Before first putting into operation it is necessary to take following steps Procedure of the first boile...

Page 4: ... part of the boiler accessories Connecting the boiler to the heating system is through screw joints G 3 4 Hot water as well as gas inlet is connected through screw joints G3 4 Before installing the boiler it is necessary to make surethat the chosenplace fits to requirements for waste gas escape and that minimum distances before mentioned are kept As this boiler is fast heating equipped with its ow...

Page 5: ... part of the boiler accessories Connecting the boiler to the heating system is through screw joints G 3 4 Hot water as well as gas inlet is connected through screw joints G3 4 Before installing the boiler it is necessary to make surethat the chosenplace fits to requirements for waste gas escape and that minimum distances before mentioned are kept As this boiler is fast heating equipped with its ow...

Page 6: ...necessary operating conditions whether it is an appliance with open combustion chamber flue or with closed combustion chamber turbo and with regard to the ways of combustion air supply and waste gas exhaust The service of the boiler must be carried out by the rules described in this manual Except service works the user must not carry out any repairson the appliance nor adjustments or dismounting a...

Page 7: ...necessary operating conditions whether it is an appliance with open combustion chamber flue or with closed combustion chamber turbo and with regard to the ways of combustion air supply and waste gas exhaust The service of the boiler must be carried out by the rules described in this manual Except service works the user must not carry out any repairson the appliance nor adjustments or dismounting a...

Page 8: ...7 445 700 355 183 NST Ventilator Flue 225 NSK Outside dimensions of the boiler 60 140 50 290 110 380 C H D H W D H W C H Gas 8 Mainpartsofthe NST boiler 3 Bar ...

Page 9: ...7 445 700 355 183 NST Ventilator Flue 225 NSK Outside dimensions of the boiler 60 140 50 290 110 380 C H D H W D H W C H Gas 8 Mainpartsofthe NST boiler 3 Bar ...

Page 10: ...ecial electric qualification by the Public Notice No 718 2002 Z z Electric installation is ready for additional connection ofroom thermostat During the operation theboiler is secured against dangerous operation conditions However the breakdowns the cause of which is not included in the boiler mechanism cannot beprotected to arise Therefore it is necessary after putting theboiler to operation to ex...

Page 11: ...ecial electric qualification by the Public Notice No 718 2002 Z z Electric installation is ready for additional connection ofroom thermostat During the operation theboiler is secured against dangerous operation conditions However the breakdowns the cause of which is not included in the boiler mechanism cannot beprotected to arise Therefore it is necessary after putting theboiler to operation to ex...

Page 12: ... ATTACK NST NSK boilers are delivered completely assemblied and tested functionally The delivery includes following documentation instruction for use with a document on boiler testing on the back side of the instruction letter of guarantee list of contract partners Waste gas exhaust Spare parts Guarantee reclamation Waste gas exhaust and combustion air comethrough doublepiping turbo version delive...

Page 13: ... ATTACK NST NSK boilers are delivered completely assemblied and tested functionally The delivery includes following documentation instruction for use with a document on boiler testing on the back side of the instruction letter of guarantee list of contract partners Waste gas exhaust Spare parts Guarantee reclamation Waste gas exhaust and combustion air comethrough doublepiping turbo version delive...

Page 14: ...uction for use Localization of boilersmust suit to project documentation Boilers are to be situated in the way to ensure all the operation conditions needed foran appliance with open combustion chamber flue as well as for closed combustion chamber turbo with regard to theway of combustion air supply and waste gas exhaust From the sides of boilers there must be free access of at least 0 2 m and in ...

Page 15: ...uction for use Localization of boilersmust suit to project documentation Boilers are to be situated in the way to ensure all the operation conditions needed foran appliance with open combustion chamber flue as well as for closed combustion chamber turbo with regard to theway of combustion air supply and waste gas exhaust From the sides of boilers there must be free access of at least 0 2 m and in ...

Page 16: ...ating system Connecting to water piping Connecting boilers to gas pipeline ATTACK boilers serve for heating systems with forced circulation Rate of waterflow can be set by the switch on the pump Before filling the heating system with water it is necessary to clean the system properly Heaters and distribution must be washed several times For thorough washing and cleaning the heating system we recom...

Page 17: ...ating system Connecting to water piping Connecting boilers to gas pipeline ATTACK boilers serve for heating systems with forced circulation Rate of waterflow can be set by the switch on the pump Before filling the heating system with water it is necessary to clean the system properly Heaters and distribution must be washed several times For thorough washing and cleaning the heating system we recom...

Page 18: ...in After opening hot water the circulationpump of the heating circuit stops Starting output set up by resistance trimer P5 is kept after burning theboiler in the time of two seconds Then the boileroutput is controlled by PID regulation by the passage and temperature of hot water to reach the set temperature as soon as possible When the waterpassage drops under 2 5 l min the operation phase of hot ...

Page 19: ...in After opening hot water the circulationpump of the heating circuit stops Starting output set up by resistance trimer P5 is kept after burning theboiler in the time of two seconds Then the boileroutput is controlled by PID regulation by the passage and temperature of hot water to reach the set temperature as soon as possible When the waterpassage drops under 2 5 l min the operation phase of hot ...

Page 20: ... out and a failure is signalled Reignition is not possible for 30 minutes This time period can be cleared reset with the operation switch If this function is chosen the boiler starts working in the heating mode to the maximum output of the burner and maximum temperature of the heating water 80 C The burner is off after reaching the maximum switch off temperature 85 C If there is a request for hot ...

Page 21: ... out and a failure is signalled Reignition is not possible for 30 minutes This time period can be cleared reset with the operation switch If this function is chosen the boiler starts working in the heating mode to the maximum output of the burner and maximum temperature of the heating water 80 C The burner is off after reaching the maximum switch off temperature 85 C If there is a request for hot ...

Page 22: ... 1 02 1 00 0 97 Resistance Temperature Resistance Temperature Resistance Temperature x B 1 1 T T10 230 V 10 15 2AF 250VAC 10 m 230 V0 1A MAX cos 0 4 230 V0 4A MAX cos 0 4 230 V0 35A MAX cos 0 4 20 C 60 C 35 60 C 70 C 30 C 80 C 20 C 40 C 35 C 85 C 25 C 75 C 10 K 0 alebo 180 sek 6 C 25 C 2 sek 45 220 mA 7 5 65 310 mA 7 5 0 80 I max 0 100 I max 10 k 1 3435 1 10 m A500 VDC R R T TO x e 21 Technical pa...

Page 23: ... 1 02 1 00 0 97 Resistance Temperature Resistance Temperature Resistance Temperature x B 1 1 T T10 230 V 10 15 2AF 250VAC 10 m 230 V0 1A MAX cos 0 4 230 V0 4A MAX cos 0 4 230 V0 35A MAX cos 0 4 20 C 60 C 35 60 C 70 C 30 C 80 C 20 C 40 C 35 C 85 C 25 C 75 C 10 K 0 alebo 180 sek 6 C 25 C 2 sek 45 220 mA 7 5 65 310 mA 7 5 0 80 I max 0 100 I max 10 k 1 3435 1 10 m A500 VDC R R T TO x e 21 Technical pa...

Page 24: ...ion of the burner by discharge spark and monitoring presenceof flame with ionization electrode Technical parameters Flame detection The circuit measuring amplifier sensitivity Table of values 230V 50 Hz Ignition Working programm and times Basic functional characteristics Minimum ionization current Maximum length of ionization cable Maximum parasitic capacity Minimum resistance of ionization electr...

Page 25: ...ion of the burner by discharge spark and monitoring presenceof flame with ionization electrode Technical parameters Flame detection The circuit measuring amplifier sensitivity Table of values 230V 50 Hz Ignition Working programm and times Basic functional characteristics Minimum ionization current Maximum length of ionization cable Maximum parasitic capacity Minimum resistance of ionization electr...

Page 26: ...ped Repeated cycling in the case of flame failure during operation The failure that can be remedied by switching off and on the main supply of power if the flame is not present Note Note If CMF unit finds flame simulation it reports anomaly and if this situation lasts longer than 15 seconds the request for heat is stopped it is switched off by a relay A new try for ignition can occur only after re...

Page 27: ...ped Repeated cycling in the case of flame failure during operation The failure that can be remedied by switching off and on the main supply of power if the flame is not present Note Note If CMF unit finds flame simulation it reports anomaly and if this situation lasts longer than 15 seconds the request for heat is stopped it is switched off by a relay A new try for ignition can occur only after re...

Page 28: ... in the probe for measuring inlet gas pressure connect manometer and read the measured value 2mbar Screwin the bolt in the probe for measuring inlet gas pressure release thebolt in the probe for measuring gas pressure on burner nozzles connect manometer and read the measured value by the chart of pressure setting in the case of setting minimum and maximum pressure on nozzles following actions are ...

Page 29: ... in the probe for measuring inlet gas pressure connect manometer and read the measured value 2mbar Screwin the bolt in the probe for measuring inlet gas pressure release thebolt in the probe for measuring gas pressure on burner nozzles connect manometer and read the measured value by the chart of pressure setting in the case of setting minimum and maximum pressure on nozzles following actions are ...

Page 30: ...o operation Service company Stamp signature Obligatory service examination after the 3rd year of operation Date Stamp signature Obligatory service examination after the 1st year of operation Date Stamp signature Obligatory service examination after the 2nd year of operation Date Stamp signature 29 Notes ...

Page 31: ...o operation Service company Stamp signature Obligatory service examination after the 3rd year of operation Date Stamp signature Obligatory service examination after the 1st year of operation Date Stamp signature Obligatory service examination after the 2nd year of operation Date Stamp signature 29 Notes ...

Page 32: ...LOVAKIA DOCUMENT on testing and completness of ATTACK gas boiler Boiler production No The product delivered with this certificate suits to technical standards and technical conditions The product was manufactured by its drawing design in requested quality and is approved by TECHNICAL TESTING FACILITY SKTC104 in Piešťany under the No of certificate 00846 104 2 2002 00847 104 2 2002 Technical inspec...